Used Homes » Kanto » Chiba Prefecture » Mobara


Mobara City, Chiba Prefecture
JR Sotobo "Mobara" walk 45 minutes
Water around all is to be replaced with a new one Currently under renovation
Price
14.8 million yen
Floor plan
4LDK
Units sold
1 units
Land area
165.3 sq m (registration)
Building area
92.74 sq m (registration)
Driveway burden-road
Share equity 64 sq m × (1 / 4)
Completion date
September 1998
Address
Mobara City, Chiba Prefecture Mutsuno
Traffic
JR Sotobo "Mobara" walk 45 minutes
Related links
[Related Sites of this company]
Contact
TEL: 0800-809-8725 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
60% ・ 200%
Time residents
January 2014
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story
Renovation
January 2014 interior renovation will be completed (kitchen ・ bathroom ・ toilet ・ wall), Exterior renovation scheduled to be completed in January 2014 (outer wall ・ roof)
Use district
Unspecified
Overview and notices
Facilities: Public Water Supply, This sewage, Parking: car space
Company profile
<Seller> Minister of Land, Infrastructure and Transport (4) No. 005475 (Ltd.) Kachitasu Mobara shop Yubinbango297-0029 Mobara City, Chiba Prefecture Takashi 494-1


Local appearance photo

Local appearance photo. Local (12 May 2013) shooting reform before a local photo. And now the roof exterior wall paint.
Local (12 May 2013) shooting reform before a local photo. And now the roof exterior wall paint.

Floor plan

Floor plan. 14.8 million yen, 4LDK, Land area 165.3 sq m , Building area 92.74 sq m
14.8 million yen, 4LDK, Land area 165.3 sq m , Building area 92.74 sq m

Living

Living. Indoor (12 May 2013) Shooting Renovation before is living photo. Cross re-covering is scheduled.
Indoor (12 May 2013) Shooting Renovation before is living photo. Cross re-covering is scheduled.

Bathroom

Bathroom. Indoor (12 May 2013) Shooting Reform is a photograph of the front bathroom. Replace the unit bus.
Indoor (12 May 2013) Shooting Reform is a photograph of the front bathroom. Replace the unit bus.

Kitchen

Kitchen. Indoor (12 May 2013) Shooting Reform is a photograph of the previous kitchen. It is to be replaced in the system kitchen.
Indoor (12 May 2013) Shooting Reform is a photograph of the previous kitchen. It is to be replaced in the system kitchen.

Non-living room

Non-living room. Indoor (12 May 2013) Shooting
Indoor (12 May 2013) Shooting

Wash basin, toilet

Wash basin, toilet. Indoor (12 May 2013) Shooting
Indoor (12 May 2013) Shooting

Toilet

Toilet. Indoor (12 May 2013) Shooting
Indoor (12 May 2013) Shooting



Location