New Homes » Tokai » Aichi Prefecture » Gamagori


Aichi Prefecture Gamagori
JR Tokaido Line "Gamagori" walk 1 minute
JR Gamagori Station 1 minute walk !! All seven buildings appeared reinforced concrete housing to achieve a life that has been wrapped in the quiet, yet excellent Station located in convenience.
■ Distance of only 50m to JR "Gamagori" station. ■ Okazaki ・ Nagoya ・ Access to the Toyohashi good !! ■ South-facing property is 4 buildings. The other three buildings also bright and friendly lighting mansion. ■ Realize the high cost performance, yet 4LDK + 2 cars parking Toi breadth.
Features pickup
Pre-ground survey / Year Available / Parking two Allowed / LDK18 tatami mats or more / Fiscal year Available / System kitchen / Flat to the station / Or more before road 6m / Corner lot / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / Bathroom 1 tsubo or more / South balcony / Double-glazing / Warm water washing toilet seat / The window in the bathroom / TV monitor interphone / All living room flooring / IH cooking heater / Built garage / Walk-in closet / Or more ceiling height 2.5m / Water filter / Three-story or more / All-electric / rooftop
Event information
Model House (please be sure to book in advance) time / 10:00 ~ 17: 00JR "Okazaki" station At a 5-minute walk, During publish a three-story RC house model house with rooftop. [Deer stage Tatsumidai chome] And structure, Performance, Become the equivalent specification such as specification, Upon consider the equal property, The contents of which you can reference. Airtight ・ Including the air-tightness and sound insulation of high thermal insulation RC housing, Ya improvement in order to increase the lighting of, Such as design, which also serves as a sophisticated practicality than 800 buildings of track record the pros and cons, , Please feel.
Property name
Deer stage Gamagori Station (roof with reinforced concrete housing)
Price
29,800,000 yen ~ 33,800,000 yen
Floor plan
4LDK
Units sold
6 units
Total units
7 units
Land area
78.83 sq m ~ 84.81 sq m (23.84 tsubo ~ 25.65 tsubo) (measured)
Building area
116.54 sq m ~ 122.52 sq m (35.25 tsubo ~ 37.06 tsubo) (measured)
Driveway burden-road
Public road south about 13m, East side about 10m, West about 6m Sessu
Completion date
2014 end of March plan
Address
Aichi Prefecture Gamagori Motomachi 230 address
Traffic
JR Tokaido Line "Gamagori" walk 1 minute
Gamagorisen Meitetsu "Gamagorikyoteijomae" walk 30 minutes
JR Tokaido Line "Mikawa Mitani" walk 31 minutes
Related links
[Related Sites of this company]
Contact
(Ltd.) RC housing Okazaki branch TEL: 0800-603-2513 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
Kenpei rate: 80%, Volume ratio: 400%
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
RC3 story
Construction
Co., Ltd. RC housing
Use district
Commerce
Land category
Residential land
Overview and notices
Building confirmation number: No. KS113-1420-00111 (A) No. 00112 (B) No. 00113 (C) 114 No. (D) 115 No. (E) 116 No. (F)
Company profile
<Seller> Minister of Land, Infrastructure and Transport (1) No. 007921 (Ltd.) RC housing Okazaki branch Yubinbango444-0854 Okazaki, Aichi Prefecture Mutsunahon cho 2-28


Complete image CG
Complete image CG

Panoramic view from the southwest side
Panoramic view from the southwest side

Same specifications photos (living)

Same specifications photos (living). Second floor LDK same specifications Photos
Second floor LDK same specifications Photos

Same specifications photos (living). Second floor LDK same specifications Photos
Second floor LDK same specifications Photos

Same specifications photo (kitchen)

Same specifications photo (kitchen). Second floor LDK same specifications Photos
Second floor LDK same specifications Photos

Same specifications photos (living)

Same specifications photos (living). Second floor LDK same specifications Photos
Second floor LDK same specifications Photos

Same specifications photos (living). Second floor LDK same specifications Photos
Second floor LDK same specifications Photos

Same specifications photos (Other introspection)

Same specifications photos (Other introspection). Rooftop balcony same specifications Photos
Rooftop balcony same specifications Photos

Same specifications photos (Other introspection). Rooftop balcony same specifications Photos
Rooftop balcony same specifications Photos

Same specifications photos (Other introspection). Rooftop balcony same specifications Photos
Rooftop balcony same specifications Photos

Same specifications photos (Other introspection). Rooftop balcony same specifications Photos
Rooftop balcony same specifications Photos

Same specifications photos (Other introspection). Rooftop balcony same specifications Photos
Rooftop balcony same specifications Photos

Same specifications photos (Other introspection). Shoes cloak Same specifications Photos
Shoes cloak Same specifications Photos

Same specifications photos (Other introspection). Shoes cloak Same specifications Photos
Shoes cloak Same specifications Photos

Same specifications photos (living)

Same specifications photos (living). Second floor LDK same specification photo (A building same specifications)
Second floor LDK same specification photo (A building same specifications)

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Finish the precursor poured concrete in the heat insulating material with FRP formwork so "integral wall structure with no air layer", Ya internal condensation of the factors that damage the precursor, To prevent the occurrence of mold and mites that cause harm to health.
Finish the precursor poured concrete in the heat insulating material with FRP formwork so "integral wall structure with no air layer", Ya internal condensation of the factors that damage the precursor, To prevent the occurrence of mold and mites that cause harm to health.

Construction ・ Construction method ・ specification. Foundation and precursor of "monocoque" in the same structure, Since the box-type of state that was fully integrated, Absorb the shock from the outside in terms ・ Balances. Wind and rain is of course excellent seismic performance.
Foundation and precursor of "monocoque" in the same structure, Since the box-type of state that was fully integrated, Absorb the shock from the outside in terms ・ Balances. Wind and rain is of course excellent seismic performance.

Construction ・ Construction method ・ specification. Heavier material sound insulation performance is increased. for that reason, Reinforced Concrete of sound insulation performance is outstanding. While even a 40dB (decibels) in the middle of the night of the city and the library, We could live in a more peaceful environment and 30dB.
Heavier material sound insulation performance is increased. for that reason, Reinforced Concrete of sound insulation performance is outstanding. While even a 40dB (decibels) in the middle of the night of the city and the library, We could live in a more peaceful environment and 30dB.

Construction ・ Construction method ・ specification. Because of the rugged concrete structure, Durable, It suppressed the running cost of the repair costs, etc.. Not only the construction costs (initial costs), Running costs also think if, Eventually it means low life cost (initial cost + running cost) is.
Because of the rugged concrete structure, Durable, It suppressed the running cost of the repair costs, etc.. Not only the construction costs (initial costs), Running costs also think if, Eventually it means low life cost (initial cost + running cost) is.

Construction ・ Construction method ・ specification. High air-tight for the inside of the concrete heat storage material is heat-insulating material to continuously cover ・ Thermal insulation performance will be exhibited. Thermal insulation material is a material called EPS (expandable poly es Len form), Without degradation almost even after the lapse of more than 50 years, Persist its performance.
High air-tight for the inside of the concrete heat storage material is heat-insulating material to continuously cover ・ Thermal insulation performance will be exhibited. Thermal insulation material is a material called EPS (expandable poly es Len form), Without degradation almost even after the lapse of more than 50 years, Persist its performance.

Construction ・ Construction method ・ specification. Because made of FRP which mold for pouring concrete and excellent peeling performance, Surface after the concrete curing, You finish in the state of most repair does not require a smooth.
Because made of FRP which mold for pouring concrete and excellent peeling performance, Surface after the concrete curing, You finish in the state of most repair does not require a smooth.

Floor plan

Floor plan. The door color from among the more than 30 colors, You can choose.
The door color from among the more than 30 colors, You can choose.

Floor plan. (A Building), Price 33,800,000 yen, 4LDK, Land area 78.94 sq m , Building area 116.54 sq m
(A Building), Price 33,800,000 yen, 4LDK, Land area 78.94 sq m , Building area 116.54 sq m

Floor plan. The door color from among the more than 30 colors, You can choose.
The door color from among the more than 30 colors, You can choose.

Other Equipment

Other Equipment. The door color from among the more than 30 colors, You can choose. (Only in case of an early conclusion of a contract you. ) Will be in city gas specifications!
The door color from among the more than 30 colors, You can choose. (Only in case of an early conclusion of a contract you. ) Will be in city gas specifications!

Other Equipment. Accent panel (photo center / You can choose your favorite color the color of the gray wall portion of) from among the more than 20 colors. (Only in case of an early conclusion of a contract you. )
Accent panel (photo center / You can choose your favorite color the color of the gray wall portion of) from among the more than 20 colors. (Only in case of an early conclusion of a contract you. )

Other Equipment. Recommended tailored to each property, We have established the entrance door of the fire protection specifications.
Recommended tailored to each property, We have established the entrance door of the fire protection specifications.

The entire compartment Figure

The entire compartment Figure. It became the remaining 5 compartment!
It became the remaining 5 compartment!



Location