New Homes » Tokai » Aichi Prefecture » Nagoya, Minami-ku


Nagoya, Aichi Prefecture, Minami-ku,
Nagoyahonsen Meitetsu "Motokasadera" walk 7 minutes
LDK16 quires more, System face-to-face open kitchen, South-facing sun per good, Bathroom Dryer, All room storage, W = 1600 with a large key front door storage, W = 900 large shampoo dresser, Entrance card key
■ South-facing sun per good! ■ Meitetsu main line "Motokasadera" walk about 7 minutes, JR Tokai "Kasadera" walk about 6 minutes and transportation well, hospital ・ school ・ There is in the bank and nearby, Ward also has been enhanced is about 1 minute and living environment walk.
Features pickup
Year Available / Bathroom Dryer / Yang per good / All room storage / Japanese-style room / Washbasin with shower / Wide balcony / Toilet 2 places / 2 or more sides balcony / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / Ventilation good / All living room flooring / Dish washing dryer / All room 6 tatami mats or more / Water filter / City gas
Price
32,600,000 yen
Floor plan
4LDK
Units sold
1 units
Land area
105.31 sq m (31.85 tsubo) (Registration)
Building area
107.32 sq m (32.46 tsubo) (measured)
Completion date
January 2014 late schedule
Address
Nagoya, Aichi Prefecture, Minami-ku, Sakushita cho 2-1313
Traffic
Nagoyahonsen Meitetsu "Motokasadera" walk 7 minutes
Related links
[Related Sites of this company]
Person in charge
[Regarding this property.] Hospital Bank ・ Bank is near, Ward ward office also living environment and a 1-minute walk has been enhanced.
Contact
TEL: 0800-808-5192 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
Kenpei rate: 60%, Volume ratio: 200%
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (2 × 4 construction method)
Use district
One dwelling
Land category
Residential land
Other limitations
Height district, Quasi-fire zones
Overview and notices
Building confirmation number: No. H25 confirmation architecture CI Tokai No. A01509 ※ There is cross-border is Kitarinchi (with written consent).
Company profile
<Seller> Governor of Aichi Prefecture (7) No. 014547 (Ltd.) cable Wye Home Yubinbango460-0002 Nagoya, Aichi Prefecture, Naka-ku Marunouchi 3-16-11 Marunouchi Park Mansion 706, Room


Local appearance photo

Local appearance photo.  ■ Facing south, Yang per good! There stepped loft of 7.2 quires!
■ Facing south, Yang per good! There stepped loft of 7.2 quires!

Floor plan

Floor plan. Price 32,600,000 yen, 4LDK, Land area 105.31 sq m , Building area 107.32 sq m
Price 32,600,000 yen, 4LDK, Land area 105.31 sq m , Building area 107.32 sq m

Local guide map
Local guide map

Local appearance photo

Local appearance photo.  ■ Facing south, Yang per good!  There stepped loft of 7.2 quires!
■ Facing south, Yang per good! There stepped loft of 7.2 quires!

Living

Living.  ■ LDK16.75 Pledge
■ LDK16.75 Pledge

Non-living room

Non-living room.  ■ Second floor 7.5 Pledge Western-style
■ Second floor 7.5 Pledge Western-style

Non-living room. Interior
Interior

Non-living room.  ■ 7.5 Pledge Western-style
■ 7.5 Pledge Western-style

Other

Other.  ■ Stepped loft 7.5 Pledge
■ Stepped loft 7.5 Pledge

Bathroom

Bathroom.  ■ Bathroom heating ventilation dryer
■ Bathroom heating ventilation dryer

Wash basin, toilet

Wash basin, toilet.  ■ W = 900 large shampoo dresser
■ W = 900 large shampoo dresser

Toilet

Toilet.  ■ 1.2F shower toilet
■ 1.2F shower toilet

Other

Other.  ■ Piping
■ Piping

Other.  ■ Piping
■ Piping

Other.  ■ Foundation laid
■ Foundation laid

Other. Basic packing method ・  ・  ・ It is a hard rubber gasket there between the solid foundation and wood.
Basic packing method ・ ・ ・ It is a hard rubber gasket there between the solid foundation and wood.

Other. Basic packing method ・  ・  ・ It is a hard rubber gasket there between the solid foundation and wood.
Basic packing method ・ ・ ・ It is a hard rubber gasket there between the solid foundation and wood.

Other. Basic packing method ・  ・ It will be installed during the entire surface of the foundation and wood.  Increase the underfloor air permeability and reduce the vibration of the earthquake.
Basic packing method ・ ・ It will be installed during the entire surface of the foundation and wood. Increase the underfloor air permeability and reduce the vibration of the earthquake.

Other. Basic packing method ・  ・ It will be installed during the entire surface of the foundation and wood.  Increase the underfloor air permeability and reduce the vibration of the earthquake.
Basic packing method ・ ・ It will be installed during the entire surface of the foundation and wood. Increase the underfloor air permeability and reduce the vibration of the earthquake.

Primary school

Primary school. Kasadera until elementary school 880m
Kasadera until elementary school 880m

Junior high school

Junior high school. Honjo 320m until junior high school
Honjo 320m until junior high school

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Woodwork basic packing method ・  ・ It will be installed during the entire surface of the foundation and wood.  Increase the underfloor air permeability and reduce the vibration of the earthquake.
Woodwork basic packing method ・ ・ It will be installed during the entire surface of the foundation and wood. Increase the underfloor air permeability and reduce the vibration of the earthquake.

Construction ・ Construction method ・ specification. Wood foundation packing method ・  ・ It will be installed during the entire surface of the foundation and wood.  Increase the underfloor air permeability and reduce the vibration of the earthquake. Construction
Wood foundation packing method ・ ・ It will be installed during the entire surface of the foundation and wood. Increase the underfloor air permeability and reduce the vibration of the earthquake. Construction

Construction ・ Construction method ・ specification. Woodworking foundation packing method ・  ・ It will be installed during the entire surface of the foundation and wood.  Increase the underfloor air permeability and reduce the vibration of the earthquake. Thing
Woodworking foundation packing method ・ ・ It will be installed during the entire surface of the foundation and wood. Increase the underfloor air permeability and reduce the vibration of the earthquake. Thing

Construction ・ Construction method ・ specification. Basic packing method ・  ・ It will be installed during the entire surface of the foundation and wood.  Increase the underfloor air permeability and reduce the vibration of the earthquake. Woodwork
Basic packing method ・ ・ It will be installed during the entire surface of the foundation and wood. Increase the underfloor air permeability and reduce the vibration of the earthquake. Woodwork

Construction ・ Construction method ・ specification. Basic packing method ・  ・ It will be installed during the entire surface of the foundation and wood.  Increase the underfloor air permeability and reduce the vibration of the earthquake. Woodwork
Basic packing method ・ ・ It will be installed during the entire surface of the foundation and wood. Increase the underfloor air permeability and reduce the vibration of the earthquake. Woodwork

Construction ・ Construction method ・ specification. Wood foundation packing method ・  ・ It will be installed during the entire surface of the foundation and wood.  Increase the underfloor air permeability and reduce the vibration of the earthquake. Construction
Wood foundation packing method ・ ・ It will be installed during the entire surface of the foundation and wood. Increase the underfloor air permeability and reduce the vibration of the earthquake. Construction

Construction ・ Construction method ・ specification. Basic packing method ・  ・ It will be installed during the entire surface of the foundation and wood.  Increase the underfloor air permeability and reduce the vibration of the earthquake. Woodwork
Basic packing method ・ ・ It will be installed during the entire surface of the foundation and wood. Increase the underfloor air permeability and reduce the vibration of the earthquake. Woodwork



Location