New Homes » Chugoku » Hiroshima » Saeki-ku


Hiroshima, Hiroshima Prefecture Saeki-ku,
Bus "Kannondai entrance" walk 6 minutes
In the roof terrace of the rooftop is 12 Pledge, Day ・ View is good. ◆ All-electric ・ Cute ◆ loft ◆ There park close to
Features pickup
Energy-saving water heaters / loft / Good view / All-electric / Storeroom
Price
20,900,000 yen
Floor plan
1LDK + S (storeroom)
Units sold
1 units
Land area
88.01 sq m (26.62 square meters)
Building area
86.33 sq m (26.11 square meters)
Driveway burden-road
Nothing, Northwest 4m width
Completion date
October 2013
Address
Hiroshima, Hiroshima Prefecture Saeki-ku Kannondai 1
Traffic
Bus "Kannondai entrance" walk 6 minutes
Related links
[Related Sites of this company]
Contact
TEL: 0800-603-6704 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
Fifty percent ・ Hundred percent
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story
Use district
One low-rise
Overview and notices
Facilities: Public Water Supply, This sewage, All-electric, Building confirmation number: 0573, Parking: car space
Company profile
<Mediation> Governor of Hiroshima Prefecture (2) Cynthia Real Estate Co., Ltd. Yubinbango731-0142 Hiroshima, Hiroshima Prefecture Asaminami No. 009292 Takatoriminami 1-20-19


Floor plan

Floor plan. 20,900,000 yen, 1LDK + S (storeroom), Land area 88.01 sq m , Building area 86.33 sq m 1F: storeroom 9.6 Pledge bathroom Wash Toilet 2F: LDK14.52 Pledge Western-style 5 Pledge loft Toilet RF: roof balcony 12 Pledge
20,900,000 yen, 1LDK + S (storeroom), Land area 88.01 sq m , Building area 86.33 sq m 1F: storeroom 9.6 Pledge bathroom Wash Toilet 2F: LDK14.52 Pledge Western-style 5 Pledge loft Toilet RF: roof balcony 12 Pledge

Local appearance photo

Local appearance photo. Local (July 2013) Shooting Construction planned site
Local (July 2013) Shooting Construction planned site

Local photos, including front road

Local photos, including front road. Local (July 2013) Shooting Construction planned site
Local (July 2013) Shooting Construction planned site

Local photos, including front road. Local (July 2013) Shooting Construction planned site
Local (July 2013) Shooting Construction planned site



Location