New Homes » Kansai » Ibaraki Prefecture » Inashiki-gun


Inashiki-gun, Ibaraki Ami-machi
JR Joban Line "Arakawaoki" 15 minutes Fuji housing complex entrance walk 5 minutes by bus
Ami Elementary School 798m, It is Ami Junior High School 1050m. It is good for both day ventilation in Zenshitsuminami orientation! Parking also put four, Friends do not have to worry about parking also come to play!
■ All building both before start of construction, Conducted a ground survey by research firm ■ Adopt a solid foundation of earthquake-resistant structures ■ Excellent conventional shaft assembly method in durability ■ The outer wall base, Using the seismic board "Dairaito" ■ Flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency ■ Seller of residential security 10 years and 10 years guaranteed by the residential warranty fulfillment method
Features pickup
Measures to conserve energy / Corresponding to the flat-35S / Airtight high insulated houses / Pre-ground survey / Parking three or more possible / Energy-saving water heaters / Facing south / System kitchen / Bathroom Dryer / Yang per good / All room storage / LDK15 tatami mats or more / Around traffic fewer / Or more before road 6m / Japanese-style room / Shaping land / garden / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / South balcony / Double-glazing / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / Ventilation good / Water filter / Maintained sidewalk
Event information
Local guide Board (please make a reservation beforehand) schedule / During the public time / 8:00 ~ 23:00
Price
17.8 million yen
Floor plan
4LDK
Units sold
1 units
Total units
1 units
Land area
189.04 sq m (measured)
Building area
98.01 sq m (measured)
Driveway burden-road
Nothing, North 6m width
Completion date
December 2013
Address
Central Inashiki-gun, Ibaraki Ami 6
Traffic
JR Joban Line "Arakawaoki" 15 minutes Fuji housing complex entrance walk 5 minutes by bus
JR Joban Line "Tsuchiura" walk 84 minutes
JR Joban Line "Hitachinoushiku" walk 95 minutes
Related links
[Related Sites of this company]
Person in charge
Rep Imaizumi Yu Age: 30 Daigyokai experience: we will 8 years your cordially to help look for the "ideal home" is supported by the full force. Financial are also adept, It will guide you through the bank and product of mortgage according to individual customers.
Contact
TEL: 0800-601-4939 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
Fifty percent ・ Hundred percent
Time residents
December 2013
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One low-rise
Overview and notices
Contact: Imaizumi Superiority, Facilities: Public Water Supply, This sewage, Individual LPG, Parking: car space
Company profile
<Mediation> Ibaraki Governor (1) No. 006907 (Ltd.) Urara Yubinbango301-0047 Ibaraki Prefecture Ryugasaki City Minaminakajima cho 667-2


Local appearance photo

Local appearance photo. Local (12 May 2013) Shooting
Local (12 May 2013) Shooting

Compartment figure

Compartment figure. 17.8 million yen, 4LDK, Land area 189.04 sq m , Building area 98.01 sq m
17.8 million yen, 4LDK, Land area 189.04 sq m , Building area 98.01 sq m

Floor plan

Floor plan. 17.8 million yen, 4LDK, Land area 189.04 sq m , Building area 98.01 sq m
17.8 million yen, 4LDK, Land area 189.04 sq m , Building area 98.01 sq m

Living
Living

Bathroom
Bathroom

Kitchen
Kitchen

Wash basin, toilet
Wash basin, toilet

Toilet
Toilet

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other Equipment

Other Equipment. House Tech Co., Ltd. of the system kitchen
House Tech Co., Ltd. of the system kitchen

Local photos, including front road

Local photos, including front road. Local (12 May 2013) Shooting
Local (12 May 2013) Shooting

Primary school

Primary school. Ami Municipal Ami to elementary school 1009m
Ami Municipal Ami to elementary school 1009m

Other introspection
Other introspection

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.
The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.

Power generation ・ Hot water equipment

Power generation ・ Hot water equipment. House Tech Co., Ltd. Unit is a bus.
House Tech Co., Ltd. Unit is a bus.

Other introspection
Other introspection

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.
By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.

Cooling and heating ・ Air conditioning

Cooling and heating ・ Air conditioning. It is with a bathroom drying function.
It is with a bathroom drying function.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The outer wall foundation of conventional shaft assembly method, Seismic board "Dairaito"
The outer wall foundation of conventional shaft assembly method, Seismic board "Dairaito"

Other Equipment

Other Equipment. The Company has adopted a multi-layer glass.
The Company has adopted a multi-layer glass.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Siding, Compared with the mortar and concrete
Siding, Compared with the mortar and concrete

Other

Other. In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.
In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.

Other. Thermal insulation of residential ・ For durability, etc., It also carried out by inspection of the third-party organization for the flat 35 corresponding clearing the technical standards housing in the Housing Finance Agency.
Thermal insulation of residential ・ For durability, etc., It also carried out by inspection of the third-party organization for the flat 35 corresponding clearing the technical standards housing in the Housing Finance Agency.

Other. Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.
Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.

Other. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other. The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.
The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.

Other. The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".
The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".

Other. In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance.
In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance.



Location