New Homes » Kansai » Ibaraki Prefecture » Koga


Ibaraki Prefecture Koga
JR Utsunomiya Line "Kurihashi" walk 34 minutes
Land more than 54 square meters, Good day in the south road! Built-in dishwasher ・ System kitchen of lift-down housing is equipped with! Three-sided mirror vanity, With bathroom dryer. School peace of mind in the Furukawa fourth elementary school 580m.
■ All building both before start of construction, Carry out ground survey by research company ■ Adopt a solid foundation of earthquake-resistant structures ■ Excellent conventional shaft assembly method in durability ■ To prevent twisting of the house, Tsuyoshiyuka method with excellent earthquake resistance ■ Basic packing method of state-of-the-art technology to eliminate under the floor of the moisture ■ Standard adopts the highest level of building materials ■ Flat 35S correspondence of houses to clear the technical standards in the Housing Finance Agency
Features pickup
Corresponding to the flat-35S / Airtight high insulated houses / Pre-ground survey / Parking two Allowed / Energy-saving water heaters / Facing south / System kitchen / Bathroom Dryer / Yang per good / A quiet residential area / LDK15 tatami mats or more / Around traffic fewer / Japanese-style room / garden / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / South balcony / Double-glazing / Zenshitsuminami direction / Warm water washing toilet seat / Nantei / Underfloor Storage / The window in the bathroom / Ventilation good / Dish washing dryer / Water filter
Event information
Local guide Board (please make a reservation beforehand) schedule / During the public time / 8:00 ~ 23:00
Price
19,800,000 yen
Floor plan
4LDK
Units sold
1 units
Total units
1 units
Land area
190 sq m
Building area
104.33 sq m
Driveway burden-road
Nothing, South 4m width
Completion date
December 2013
Address
Ibaraki Prefecture Koga Nakata
Traffic
JR Utsunomiya Line "Kurihashi" walk 34 minutes
Related links
[Related Sites of this company]
Person in charge
Rep Imaizumi Yu Age: 30 Daigyokai experience: we will 8 years your cordially to help look for the "ideal home" is supported by the full force. Financial are also adept, It will guide you through the bank and product of mortgage according to individual customers.
Contact
TEL: 0800-601-4939 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
60% ・ 200%
Time residents
December 2013
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One middle and high
Overview and notices
Contact: Imaizumi Superiority, Facilities: Public Water Supply, Centralized septic tank, Individual LPG, Building confirmation number: No. 13UDI3S Ken 02215, Parking: car space
Company profile
<Mediation> Ibaraki Governor (1) No. 006907 (Ltd.) Urara Yubinbango301-0047 Ibaraki Prefecture Ryugasaki City Minaminakajima cho 667-2


Local appearance photo

Local appearance photo. Local (12 May 2013) Shooting
Local (12 May 2013) Shooting

Compartment figure

Compartment figure. 19,800,000 yen, 4LDK, Land area 190 sq m , Building area 104.33 sq m
19,800,000 yen, 4LDK, Land area 190 sq m , Building area 104.33 sq m

Floor plan

Floor plan. 19,800,000 yen, 4LDK, Land area 190 sq m , Building area 104.33 sq m
19,800,000 yen, 4LDK, Land area 190 sq m , Building area 104.33 sq m

Same specifications photo (bathroom)

Same specifications photo (bathroom). With bathroom dryer.
With bathroom dryer.

Same specifications photo (kitchen)
Same specifications photo (kitchen)

Wash basin, toilet

Wash basin, toilet. Same specifications
Same specifications

Toilet

Toilet. Same specifications
Same specifications

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Standard adopted "rebar-filled concrete mat foundation". The base portion is Haisuji the 13mm rebar in a grid pattern in 200mm pitch, It made by pouring concrete. Because solid foundation to cover the basis of the whole ground, It can be transmitted to the ground by dispersing a load of the building, It is possible to improve the durability and earthquake resistance against immobility subsidence. or, Because under the floor over the entire surface is concrete will also be moisture-proof measures.
Standard adopted "rebar-filled concrete mat foundation". The base portion is Haisuji the 13mm rebar in a grid pattern in 200mm pitch, It made by pouring concrete. Because solid foundation to cover the basis of the whole ground, It can be transmitted to the ground by dispersing a load of the building, It is possible to improve the durability and earthquake resistance against immobility subsidence. or, Because under the floor over the entire surface is concrete will also be moisture-proof measures.

Other Equipment

Other Equipment.  ■ Steam & hot cooperation washing
■ Steam & hot cooperation washing

Local photos, including front road

Local photos, including front road. Local (12 May 2013) Shooting
Local (12 May 2013) Shooting

Primary school

Primary school. 543m until Koga Municipal Furukawa fourth elementary school
543m until Koga Municipal Furukawa fourth elementary school

Other introspection

Other introspection. Same specifications
Same specifications

Other

Other. First floor shutter. Same specifications.
First floor shutter. Same specifications.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. "Wooden set construction method" is the foundation, Pillar, In construction method to build a house of the skeleton, such as a beam in the axis of the tree, For more than 1000 years, Improvement ・ I have repeated the development. Reinforcement hardware attached to the junction, Such as on the floor to use the structural plywood, Strong earthquake resistance ・ We have to demonstrate the durability.
"Wooden set construction method" is the foundation, Pillar, In construction method to build a house of the skeleton, such as a beam in the axis of the tree, For more than 1000 years, Improvement ・ I have repeated the development. Reinforcement hardware attached to the junction, Such as on the floor to use the structural plywood, Strong earthquake resistance ・ We have to demonstrate the durability.

Other Equipment

Other Equipment. It is our easy-to-clean a flat enamel top.
It is our easy-to-clean a flat enamel top.

Other introspection

Other introspection. Same specifications
Same specifications

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. To prevent the deterioration of the building, It is important the elimination of under the floor of the moisture that causes corrosion of the structural part. The "basic packing method" adopted in the standard, Of conventional construction method 1.5 ~ Exert twice the ventilation performance. This effectively releases moisture by providing a "outer wall ventilation layer" in addition the wall.
To prevent the deterioration of the building, It is important the elimination of under the floor of the moisture that causes corrosion of the structural part. The "basic packing method" adopted in the standard, Of conventional construction method 1.5 ~ Exert twice the ventilation performance. This effectively releases moisture by providing a "outer wall ventilation layer" in addition the wall.

Other Equipment

Other Equipment. By the movement of the smooth up and down, Lift down wall to allow for an efficient storage.
By the movement of the smooth up and down, Lift down wall to allow for an efficient storage.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. In construction method Tsukeru bear directly the structure for the surface material to the foundation and beams, By integrating the whole house the floor as one of the plane, It will be a very strong structure in force from the horizontal. To prevent twisting of the house, It provides excellent effect on earthquake resistance.
In construction method Tsukeru bear directly the structure for the surface material to the foundation and beams, By integrating the whole house the floor as one of the plane, It will be a very strong structure in force from the horizontal. To prevent twisting of the house, It provides excellent effect on earthquake resistance.

Other

Other.  [Flat 35] Obtain a certificate of conformity of the S. Thermal insulation of residential ・ For durability, etc., Based on the technical standards Housing Finance Agency was established, We have received a property inspection.
[Flat 35] Obtain a certificate of conformity of the S. Thermal insulation of residential ・ For durability, etc., Based on the technical standards Housing Finance Agency was established, We have received a property inspection.

Other. The residential warranty fulfillment method, We guarantee a warranty against defects for 10 years about the part that prevents the intrusion of structural strength on the main part and rainwater. Guarantee 10 years later, Long-term extended warranty up to 5 years each up to 35 years (building free diagnosis ・ Paid repair work) Yes.
The residential warranty fulfillment method, We guarantee a warranty against defects for 10 years about the part that prevents the intrusion of structural strength on the main part and rainwater. Guarantee 10 years later, Long-term extended warranty up to 5 years each up to 35 years (building free diagnosis ・ Paid repair work) Yes.

Other. Ground survey by ground survey company before foundation construction. Based on the survey results, Conducted a ground reinforcement, etc., We have taken measures like not to differential settlement. Even in the case where there is damage caused by any chance differential settlement, We took a system to conservation in a third party, etc..
Ground survey by ground survey company before foundation construction. Based on the survey results, Conducted a ground reinforcement, etc., We have taken measures like not to differential settlement. Even in the case where there is damage caused by any chance differential settlement, We took a system to conservation in a third party, etc..

Other. To support material that is supporting the building of the floor called "floor bunch", Adoption of the floor beams made of steel repel rust and termites. High reliability compared to conventional products, Support the sturdy structure in the strength of peace of mind.
To support material that is supporting the building of the floor called "floor bunch", Adoption of the floor beams made of steel repel rust and termites. High reliability compared to conventional products, Support the sturdy structure in the strength of peace of mind.



Location