New Homes » Kansai » Ibaraki Prefecture » Moriya


Ibaraki Prefecture Moriya
Tsukuba Express "Moriya" walk 13 minutes
TX Moriya Station walk 13 minutes. Kuronai Elementary School 900m, School of Moriya junior high school 400m and the child is also safe. Cash 650,000 yen cash back subject property! Purchase of the Company are various expenses you need cheaply.
■ All building both before start of construction, Carry out ground survey by research company ■ Adopt a solid foundation of earthquake-resistant structures ■ Excellent conventional shaft assembly method in durability ■ The outer wall base, Using the seismic board "Dairaito" ■ Flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency ■ Seller of residential security 10 years and 10 years guaranteed by the residential warranty fulfillment method
Features pickup
Corresponding to the flat-35S / Solar power system / Airtight high insulated houses / Pre-ground survey / Parking two Allowed / Immediate Available / 2 along the line more accessible / Energy-saving water heaters / System kitchen / Bathroom Dryer / Yang per good / All room storage / A quiet residential area / LDK15 tatami mats or more / Japanese-style room / Starting station / garden / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / South balcony / Double-glazing / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / Ventilation good / Water filter
Event information
Local guide Board (please make a reservation beforehand) schedule / During the public time / 8:00 ~ 23:00
Price
21,800,000 yen
Floor plan
4LDK
Units sold
1 units
Total units
1 units
Land area
150.39 sq m (measured)
Building area
98.01 sq m (measured)
Driveway burden-road
Nothing, North 4.5m width
Completion date
October 2013
Address
Ibaraki Prefecture Moriya Yuri 2
Traffic
Tsukuba Express "Moriya" walk 13 minutes
Jōsō Line "Shinmoriya" walk 32 minutes
Jōsō Line "Minamimoriya" walk 40 minutes
Related links
[Related Sites of this company]
Person in charge
Rep Imaizumi Yu Age: 30 Daigyokai experience: we will 8 years your cordially to help look for the "ideal home" is supported by the full force. Financial are also adept, It will guide you through the bank and product of mortgage according to individual customers.
Contact
TEL: 0800-601-4939 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
40% ・ 80%
Time residents
Immediate available
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One low-rise
Overview and notices
Contact: Imaizumi Superiority, Facilities: Public Water Supply, This sewage, Individual LPG, Parking: car space
Company profile
<Mediation> Ibaraki Governor (1) No. 006907 (Ltd.) Urara Yubinbango301-0047 Ibaraki Prefecture Ryugasaki City Minaminakajima cho 667-2


Local appearance photo

Local appearance photo. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Compartment figure

Compartment figure. 21,800,000 yen, 4LDK, Land area 150.39 sq m , Building area 98.01 sq m
21,800,000 yen, 4LDK, Land area 150.39 sq m , Building area 98.01 sq m

Floor plan

Floor plan. 21,800,000 yen, 4LDK, Land area 150.39 sq m , Building area 98.01 sq m
21,800,000 yen, 4LDK, Land area 150.39 sq m , Building area 98.01 sq m

Living

Living. Indoor (10 May 2013) Shooting
Indoor (10 May 2013) Shooting

Bathroom

Bathroom. Indoor (10 May 2013) Shooting
Indoor (10 May 2013) Shooting

Kitchen

Kitchen. Indoor (10 May 2013) Shooting
Indoor (10 May 2013) Shooting

Wash basin, toilet

Wash basin, toilet. Indoor (10 May 2013) Shooting
Indoor (10 May 2013) Shooting

Toilet

Toilet. Indoor (10 May 2013) Shooting
Indoor (10 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other Equipment

Other Equipment. House Tech Co., Ltd. of the system kitchen
House Tech Co., Ltd. of the system kitchen

Local photos, including front road

Local photos, including front road. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Parking lot

Parking lot. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Library

library. Moriya 999m to Central Library
Moriya 999m to Central Library

Other introspection

Other introspection. Indoor (10 May 2013) Shooting
Indoor (10 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.
The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.

Power generation ・ Hot water equipment

Power generation ・ Hot water equipment. House Tech Co., Ltd. Unit is a bus.
House Tech Co., Ltd. Unit is a bus.

Other introspection

Other introspection. Indoor (10 May 2013) Shooting
Indoor (10 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.
By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.

Cooling and heating ・ Air conditioning

Cooling and heating ・ Air conditioning. It is with a bathroom drying function.
It is with a bathroom drying function.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The outer wall foundation of conventional shaft assembly method, Seismic board "Dairaito"
The outer wall foundation of conventional shaft assembly method, Seismic board "Dairaito"

Other Equipment

Other Equipment. The Company has adopted a multi-layer glass.
The Company has adopted a multi-layer glass.

Other

Other. In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.
In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.

Other. Thermal insulation of residential ・ For durability, etc., It also carried out by inspection of the third-party organization for the flat 35 corresponding clearing the technical standards housing in the Housing Finance Agency.
Thermal insulation of residential ・ For durability, etc., It also carried out by inspection of the third-party organization for the flat 35 corresponding clearing the technical standards housing in the Housing Finance Agency.

Other. Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.
Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.

Other. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other. The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.
The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.

Other. The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".
The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".

Other. In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance.
In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance.



Location