New Homes » Kansai » Ibaraki Prefecture » Moriya


Ibaraki Prefecture Moriya
Tsukuba Express "Moriya" walk 42 minutes
Also safe school for children in the 5-minute walk from the Oisawa elementary school! (Oisawa Elementary School 350m, Day is good for the junior high school Goshogaoka 1500m) front road of 6 meters southeast road!
■ All building both before start of construction, Carry out ground survey by research company ■ Adopt a solid foundation of earthquake-resistant structures ■ Excellent conventional shaft assembly method in durability ■ The outer wall base, Using the seismic board "Dairaito" ■ Flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency ■ Seller of residential security 10 years and 10 years guaranteed by the residential warranty fulfillment method
Features pickup
Airtight high insulated houses / Pre-ground survey / Parking three or more possible / Immediate Available / Energy-saving water heaters / It is close to the city / Facing south / System kitchen / Bathroom Dryer / All room storage / Flat to the station / Siemens south road / A quiet residential area / LDK15 tatami mats or more / Around traffic fewer / Or more before road 6m / Japanese-style room / Shaping land / garden / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / South balcony / Double-glazing / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / TV monitor interphone / Ventilation good / Built garage / Water filter / Maintained sidewalk
Event information
Local guide Board (please make a reservation beforehand) schedule / During the public time / 8:00 ~ 23:00
Price
25,800,000 yen
Floor plan
4LDK
Units sold
1 units
Total units
1 units
Land area
176.91 sq m (measured)
Building area
96.38 sq m
Driveway burden-road
Nothing, South 6m width
Completion date
November 2013
Address
Ibaraki Prefecture Moriya Yakushidai 6
Traffic
Tsukuba Express "Moriya" walk 42 minutes
Jōsō Line "Shinmoriya" walk 35 minutes
Jōsō Line "Kokinu" walk 45 minutes
Related links
[Related Sites of this company]
Person in charge
Person in charge of real-estate and building Honda Hideki Age: 30 Daigyokai experience: I 10 years very, very thing commonplace, "parent, Brother, In the same manner as the best friend "and contact with customers. "parent, Brother, Proposal that can not be recommended for best friend "does not do to you. Well is that of real estate, Also available upon consultation about mortgage.
Contact
TEL: 0800-601-4939 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
40% ・ 80%
Time residents
Immediate available
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One low-rise
Overview and notices
Contact: Honda Hideki, Facilities: Public Water Supply, This sewage, Individual LPG, Parking: Garage
Company profile
<Mediation> Ibaraki Governor (1) No. 006907 (Ltd.) Urara Yubinbango301-0047 Ibaraki Prefecture Ryugasaki City Minaminakajima cho 667-2


Local appearance photo

Local appearance photo. Local (November 29, 2013) Shooting
Local (November 29, 2013) Shooting

Compartment figure

Compartment figure. 25,800,000 yen, 4LDK, Land area 176.91 sq m , Building area 96.38 sq m
25,800,000 yen, 4LDK, Land area 176.91 sq m , Building area 96.38 sq m

Floor plan

Floor plan. 25,800,000 yen, 4LDK, Land area 176.91 sq m , Building area 96.38 sq m
25,800,000 yen, 4LDK, Land area 176.91 sq m , Building area 96.38 sq m

Living
Living

Bathroom
Bathroom

Kitchen
Kitchen

Entrance

Entrance. Local (November 29, 2013) Shooting
Local (November 29, 2013) Shooting

Wash basin, toilet

Wash basin, toilet. Local (November 29, 2013) Shooting
Local (November 29, 2013) Shooting

Toilet

Toilet. Local (November 29, 2013) Shooting
Local (November 29, 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other Equipment

Other Equipment. House Tech Co., Ltd. of the system kitchen
House Tech Co., Ltd. of the system kitchen

Local photos, including front road

Local photos, including front road. Local (November 29, 2013) Shooting
Local (November 29, 2013) Shooting

Primary school

Primary school. Moriya Municipal Oisawa to elementary school 626m
Moriya Municipal Oisawa to elementary school 626m

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.
The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.

Power generation ・ Hot water equipment

Power generation ・ Hot water equipment. House Tech Co., Ltd. Unit is a bus.
House Tech Co., Ltd. Unit is a bus.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.
By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.

Cooling and heating ・ Air conditioning

Cooling and heating ・ Air conditioning. It is with a bathroom drying function.
It is with a bathroom drying function.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The outer wall foundation of conventional shaft assembly method, Seismic board "Dairaito"
The outer wall foundation of conventional shaft assembly method, Seismic board "Dairaito"

Other Equipment

Other Equipment. The Company has adopted a multi-layer glass.
The Company has adopted a multi-layer glass.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Siding, Compared with the mortar and concrete
Siding, Compared with the mortar and concrete

Other Equipment

Other Equipment. Washlet will be marked with TOTO Ltd. of function.
Washlet will be marked with TOTO Ltd. of function.

Other

Other. In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.
In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.

Other. Thermal insulation of residential ・ For durability, etc., It also carried out by inspection of the third-party organization for the flat 35 corresponding clearing the technical standards housing in the Housing Finance Agency.
Thermal insulation of residential ・ For durability, etc., It also carried out by inspection of the third-party organization for the flat 35 corresponding clearing the technical standards housing in the Housing Finance Agency.

Other. Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.
Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.

Other. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other. The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.
The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.

Other. The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".
The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".

Other. In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance.
In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance.



Location