New Homes » Kansai » Ibaraki Prefecture » Ryugasaki City


Ibaraki Prefecture Ryugasaki City
JR Joban Line "Sanuki" bus 18 minutes Shironouchi 5-chome NishiAyumi 6 minutes
Shironouchi Elementary School 850m, Shironouchi junior high school 100m. School is near is also safe school children! local, To the Company in Ryugasaki guide Please leave!
■ All building both before start of construction, Conducted a ground survey by research firm ■ Adopt a solid foundation of earthquake-resistant structures ■ Excellent conventional shaft assembly method in durability ■ The outer wall base, Using the seismic board "Dairaito" ■ Flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency ■ Seller of residential security 10 years and 10 years guaranteed by the residential warranty fulfillment method
Features pickup
Airtight high insulated houses / Pre-ground survey / Parking two Allowed / Super close / Facing south / System kitchen / Bathroom Dryer / All room storage / A quiet residential area / LDK15 tatami mats or more / Or more before road 6m / Shaping land / Idyll / garden / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / Warm water washing toilet seat / Nantei / Underfloor Storage / The window in the bathroom / TV monitor interphone / Leafy residential area / Ventilation good / Water filter / City gas / Maintained sidewalk
Event information
Local tours (please make a reservation beforehand) schedule / During the public time / 8:00 ~ 23:00
Price
14.8 million yen ~ 19,800,000 yen
Floor plan
4LDK
Units sold
10 units
Total units
10 units
Land area
187.73 sq m ~ 227.36 sq m (56.78 tsubo ~ 68.77 tsubo) (measured)
Building area
93.96 sq m ~ 102.86 sq m (28.42 tsubo ~ 31.11 tsubo) (measured)
Driveway burden-road
North ・ South ・ East 6.00 on public roads
Completion date
2013 in late November
Address
Ibaraki Prefecture Ryugasaki City Shironouchi 5
Traffic
JR Joban Line "Sanuki" bus 18 minutes Shironouchi 5-chome NishiAyumi 6 minutes
Ryūgasaki Line "Ryugasaki" walk 52 minutes
Ryūgasaki Line "Illizi" walk 81 minutes
Related links
[Related Sites of this company]
Person in charge
Person in charge of real-estate and building Honda Hideki Age: 30 Daigyokai experience: I 10 years very, very thing commonplace, "parent, Brother, In the same manner as the best friend "and contact with customers. "parent, Brother, Proposal that can not be recommended for best friend "does not do to you. Well is that of real estate, Also available upon consultation about mortgage.
Contact
TEL: 0800-601-4939 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Most price range
17 million yen (3 units)
Building coverage, floor area ratio
Building coverage: 60%, Volume ratio: 150%
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One middle and high
Overview and notices
Contact: Honda Hideki, Building confirmation number: No. H25SHC111789
Company profile
<Mediation> Ibaraki Governor (1) No. 006907 (Ltd.) Urara Yubinbango301-0047 Ibaraki Prefecture Ryugasaki City Minaminakajima cho 667-2


Local appearance photo

Local appearance photo. All south subdivision 4 buildings site (November 21, 2013) Shooting
All south subdivision 4 buildings site (November 21, 2013) Shooting

Other

Other. layout drawing
layout drawing

Local photos, including front road

Local photos, including front road. Local (November 21, 2013) Shooting North
Local (November 21, 2013) Shooting North

Floor plan

Floor plan. Price 14.8 million yen, 4LDK, Land area 202.4 sq m , Building area 93.96 sq m
Price 14.8 million yen, 4LDK, Land area 202.4 sq m , Building area 93.96 sq m

Living
Living

Bathroom
Bathroom

Kitchen
Kitchen

Entrance

Entrance. Shoebox
Shoebox

Wash basin, toilet

Wash basin, toilet. Same specifications
Same specifications

Receipt

Receipt. Same specifications
Same specifications

Toilet

Toilet. Same specifications
Same specifications

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other Equipment

Other Equipment. House Tech Co., Ltd. of the system kitchen
House Tech Co., Ltd. of the system kitchen

Primary school

Primary school. Shironouchi until elementary school 850m
Shironouchi until elementary school 850m

Other

Other. Japanese style room
Japanese style room

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.
The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.

Power generation ・ Hot water equipment

Power generation ・ Hot water equipment. House Tech Co., Ltd. Unit is a bus.
House Tech Co., Ltd. Unit is a bus.

Other

Other. Gas stove
Gas stove

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.
By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.

Cooling and heating ・ Air conditioning

Cooling and heating ・ Air conditioning. It is with a bathroom drying function.
It is with a bathroom drying function.

Other

Other. Post unit
Post unit

Other. In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.
In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.

Other. Thermal insulation of residential ・ For durability, etc., For flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency
Thermal insulation of residential ・ For durability, etc., For flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency

Other. Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.
Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.

Other. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.
The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.

Construction ・ Construction method ・ specification. The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".
The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".

Other

Other. In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance. When you use the seismic joint hardware, Since effectively convey the stress applied to the building, Become a stable and robust structure, In peace
In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance. When you use the seismic joint hardware, Since effectively convey the stress applied to the building, Become a stable and robust structure, In peace



Location