New Homes » Kansai » Ibaraki Prefecture » Toride


Ibaraki Prefecture Toride
JR Joban Line "handle" walk 22 minutes
JR Toride Station walk 22 minutes! ! Ino Elementary School 400m ・ Is a school safe in the handle first junior high school 1100m. Life is a convenient location to shopping facilities and fulfilling.
■ All building both before start of construction, Conducted a ground survey by research firm ■ Adopt a solid foundation of earthquake-resistant structures ■ Excellent conventional shaft assembly method in durability ■ The outer wall base, Using the seismic board "Dairaito" ■ Flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency ■ Seller of residential security 10 years and 10 years guaranteed by the residential warranty fulfillment method
Features pickup
Corresponding to the flat-35S / Airtight high insulated houses / Pre-ground survey / Parking two Allowed / Land 50 square meters or more / It is close to the city / System kitchen / Bathroom Dryer / LDK15 tatami mats or more / Japanese-style room / Starting station / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / South balcony / Double-glazing / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / TV monitor interphone / Water filter
Event information
Local tours (please make a reservation beforehand) schedule / Every Saturday, Sunday and public holidays time / 8:00 ~ 23:00
Price
18,800,000 yen ~ 24,800,000 yen
Floor plan
4LDK
Units sold
4 units
Land area
183.1 sq m ~ 224.67 sq m
Building area
95.17 sq m ~ 98.41 sq m
Completion date
November 2013
Address
Ibaraki Prefecture Toride Ino
Traffic
JR Joban Line "handle" walk 22 minutes
Related links
[Related Sites of this company]
Person in charge
Person in charge of real-estate and building Honda Hideki Age: 30 Daigyokai experience: I 10 years very, very thing commonplace, "parent, Brother, In the same manner as the best friend "and contact with customers. "parent, Brother, Proposal that can not be recommended for best friend "does not do to you. Well is that of real estate, Also available upon consultation about mortgage.
Contact
TEL: 0800-601-4939 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
Building coverage: 60% Volume ratio: 200%
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One middle and high
Overview and notices
Contact: Honda Hideki, Building confirmation number: No. H25SHC112322 No. H25SHC112323 No. H25SHC112325 No. H25SHC112326
Company profile
<Mediation> Ibaraki Governor (1) No. 006907 (Ltd.) Urara Yubinbango301-0047 Ibaraki Prefecture Ryugasaki City Minaminakajima cho 667-2


Local appearance photo

Local appearance photo. Local (November 26, 2013) Shooting
Local (November 26, 2013) Shooting

Other

Other. layout drawing
layout drawing

Local photos, including front road

Local photos, including front road. Local (November 26, 2013) Shooting
Local (November 26, 2013) Shooting

Floor plan

Floor plan. (9 Building), Price 20.8 million yen, 4LDK, Land area 224.67 sq m , Building area 96.79 sq m
(9 Building), Price 20.8 million yen, 4LDK, Land area 224.67 sq m , Building area 96.79 sq m

Living

Living. Indoor (November 26, 2013) Shooting 8 Building
Indoor (November 26, 2013) Shooting 8 Building

Bathroom

Bathroom. Indoor (November 26, 2013) Shooting 8 Building
Indoor (November 26, 2013) Shooting 8 Building

Kitchen

Kitchen. Indoor (November 26, 2013) Shooting
Indoor (November 26, 2013) Shooting

Entrance

Entrance. Shoebox
Shoebox

Wash basin, toilet

Wash basin, toilet. (November 26, 2013) Shooting
(November 26, 2013) Shooting

Receipt

Receipt. Same specifications
Same specifications

Toilet

Toilet. (November 26, 2013) Shooting
(November 26, 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other Equipment

Other Equipment. House Tech Co., Ltd. of the system kitchen
House Tech Co., Ltd. of the system kitchen

Shopping centre

Shopping centre. MrMax up to handle shop 1294m
MrMax up to handle shop 1294m

Other introspection

Other introspection. Japanese style room
Japanese style room

Other

Other. Gas stove
Gas stove

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.
The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.

Power generation ・ Hot water equipment

Power generation ・ Hot water equipment. House Tech Co., Ltd. Unit is a bus.
House Tech Co., Ltd. Unit is a bus.

Other

Other. Post unit
Post unit

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.
By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.

Cooling and heating ・ Air conditioning

Cooling and heating ・ Air conditioning. It is with a bathroom drying function.
It is with a bathroom drying function.

Other

Other. In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.
In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.

Other. Thermal insulation of residential ・ For durability, etc., For flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency
Thermal insulation of residential ・ For durability, etc., For flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency

Other. Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.
Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.

Other. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.
The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.

Construction ・ Construction method ・ specification. The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".
The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".

Other

Other. In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance. When you use the seismic joint hardware, Since effectively convey the stress applied to the building, Become a stable and robust structure, In peace
In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance. When you use the seismic joint hardware, Since effectively convey the stress applied to the building, Become a stable and robust structure, In peace



Location