New Homes » Kansai » Ibaraki Prefecture » Tsukuba City


Tsukuba, Ibaraki Prefecture
Tsukuba Express "green" 20 minutes green walk 7 minutes by bus
(From the seller) amide, shutter, Such as curtain rail 2 ~ 5-point pack gift! Sunny!
■ All building both before start of construction, Carry out ground survey by research company ■ Adopt a solid foundation of earthquake-resistant structures ■ Excellent conventional shaft assembly method in durability ■ The outer wall base, Using the seismic board "Dairaito" ■ Flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency ■ Seller of residential security 10 years and 10 years guaranteed by the residential warranty fulfillment method
Features pickup
Airtight high insulated houses / Pre-ground survey / Parking two Allowed / Land 50 square meters or more / System kitchen / Bathroom Dryer / All room storage / A quiet residential area / LDK15 tatami mats or more / Japanese-style room / garden / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / South balcony / Double-glazing / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / TV monitor interphone / Water filter
Event information
Local tours (please make a reservation beforehand) schedule / Every Saturday, Sunday and public holidays time / 8:00 ~ 23:00
Price
13.5 million yen ~ 18,800,000 yen
Floor plan
4LDK ・ 4LDK + S (storeroom)
Units sold
6 units
Land area
169.64 sq m ~ 191.65 sq m
Building area
93.15 sq m ~ 98.01 sq m
Completion date
October 2013
Address
Tsukuba, Ibaraki Prefecture Kannondai 1
Traffic
Tsukuba Express "green" 20 minutes green walk 7 minutes by bus
Related links
[Related Sites of this company]
Person in charge
Rep Imaizumi Yu Age: 30 Daigyokai experience: we will 8 years your cordially to help look for the "ideal home" is supported by the full force. Financial are also adept, It will guide you through the bank and product of mortgage according to individual customers.
Contact
TEL: 0800-601-4939 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
Building coverage: 60% Volume ratio: 200%
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One middle and high
Overview and notices
Contact: Imaizumi Superiority, Building confirmation number: No. 25SHC108436
Company profile
<Mediation> Ibaraki Governor (1) No. 006907 (Ltd.) Urara Yubinbango301-0047 Ibaraki Prefecture Ryugasaki City Minaminakajima cho 667-2


Local appearance photo

Local appearance photo. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Other

Other. layout drawing
layout drawing

Local photos, including front road

Local photos, including front road. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Floor plan

Floor plan. (6 Building), Price 13.5 million yen, 4LDK+S, Land area 191.39 sq m , Building area 96.79 sq m
(6 Building), Price 13.5 million yen, 4LDK+S, Land area 191.39 sq m , Building area 96.79 sq m

Local appearance photo

Local appearance photo. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Living

Living. Indoor (10 May 2013) Shooting
Indoor (10 May 2013) Shooting

Bathroom

Bathroom. Indoor (10 May 2013) Shooting
Indoor (10 May 2013) Shooting

Kitchen

Kitchen. Indoor (10 May 2013) Shooting
Indoor (10 May 2013) Shooting

Entrance

Entrance. Shoebox
Shoebox

Wash basin, toilet

Wash basin, toilet. Same specifications
Same specifications

Receipt

Receipt. Same specifications
Same specifications

Toilet

Toilet. Same specifications
Same specifications

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other Equipment

Other Equipment. House Tech Co., Ltd. of the system kitchen
House Tech Co., Ltd. of the system kitchen

Park

park. Yatabe 1743m until the Sports Park
Yatabe 1743m until the Sports Park

Other introspection

Other introspection. Japanese style room
Japanese style room

Other

Other. Gas stove
Gas stove

Local appearance photo

Local appearance photo. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.
The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.

Power generation ・ Hot water equipment

Power generation ・ Hot water equipment. House Tech Co., Ltd. Unit is a bus.
House Tech Co., Ltd. Unit is a bus.

Other

Other. Post unit
Post unit

Other. In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.
In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.

Other. Thermal insulation of residential ・ For durability, etc., For flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency
Thermal insulation of residential ・ For durability, etc., For flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency

Other. Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.
Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.

Other. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.
The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to the old-fashioned cloth foundation.

Construction ・ Construction method ・ specification. The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".
The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".

Other

Other. In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance. When you use the seismic joint hardware, Since effectively convey the stress applied to the building, Become a stable and robust structure, In peace
In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance. When you use the seismic joint hardware, Since effectively convey the stress applied to the building, Become a stable and robust structure, In peace



Location