New Homes » Kansai » Ibaraki Prefecture » Tsukuba City


Tsukuba, Ibaraki Prefecture
JR Joban Line "Ushiku" walk 27 minutes
(From the seller) amide, shutter, Such as curtain rail 2 ~ 5-point pack gift! Zenshitsuminami direction. For flat 35 Available housing, It is settled in the technical standards Housing Finance Agency.
■ All building both before start of construction, Conducted a ground survey by research firm ■ Adopt a solid foundation of earthquake-resistant structures ■ Excellent conventional shaft assembly method in durability ■ The outer wall base, Using the seismic board "Dairaito" ■ Flat 35 correspondence of houses to clear the technical standards in the Housing Finance Agency ■ Seller of residential security 10 years and 10 years guaranteed by the residential warranty fulfillment method
Features pickup
Airtight high insulated houses / Pre-ground survey / Parking three or more possible / Land 50 square meters or more / Energy-saving water heaters / System kitchen / Bathroom Dryer / All room storage / Flat to the station / A quiet residential area / LDK15 tatami mats or more / Japanese-style room / garden / Washbasin with shower / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / South balcony / Double-glazing / Zenshitsuminami direction / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / TV monitor interphone / All room 6 tatami mats or more / Water filter / City gas
Event information
Local guide Board (please make a reservation beforehand) schedule / During the public time / 8:00 ~ 23:00
Price
14.8 million yen
Floor plan
4LDK + S (storeroom)
Units sold
1 units
Total units
1 units
Land area
176.93 sq m
Building area
96.79 sq m
Driveway burden-road
Nothing, West 4.7m width
Completion date
October 2013
Address
Tsukuba, Ibaraki Prefecture Hoyodai
Traffic
JR Joban Line "Ushiku" walk 27 minutes
Related links
[Related Sites of this company]
Person in charge
Person in charge of real-estate and building Honda Hideki Age: 30 Daigyokai experience: I 10 years very, very thing commonplace, "parent, Brother, In the same manner as the best friend "and contact with customers. "parent, Brother, Proposal that can not be recommended for best friend "does not do to you. Well is that of real estate, Also available upon consultation about mortgage.
Contact
TEL: 0800-601-4939 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
Fifty percent ・ Hundred percent
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
Urbanization control area
Overview and notices
Contact: Honda Hideki, Facilities: Public Water Supply, This sewage, City gas, Building Permits reason: control area per building permit requirements. There authorization requirements of building owners, Building confirmation number: No. H25SHC110231 , Parking: Garage
Company profile
<Mediation> Ibaraki Governor (1) No. 006907 (Ltd.) Urara Yubinbango301-0047 Ibaraki Prefecture Ryugasaki City Minaminakajima cho 667-2


Local appearance photo

Local appearance photo. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Compartment figure

Compartment figure. 14.8 million yen, 4LDK + S (storeroom), Land area 176.93 sq m , Building area 96.79 sq m
14.8 million yen, 4LDK + S (storeroom), Land area 176.93 sq m , Building area 96.79 sq m

Floor plan

Floor plan. 14.8 million yen, 4LDK + S (storeroom), Land area 176.93 sq m , Building area 96.79 sq m
14.8 million yen, 4LDK + S (storeroom), Land area 176.93 sq m , Building area 96.79 sq m

Local appearance photo

Local appearance photo. Local (September 2013) Shooting
Local (September 2013) Shooting

Living

Living. Same specifications
Same specifications

Bathroom

Bathroom. Same specifications
Same specifications

Kitchen

Kitchen. Same specifications
Same specifications

Wash basin, toilet

Wash basin, toilet. Same specifications
Same specifications

Toilet

Toilet. Same specifications
Same specifications

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other Equipment

Other Equipment. House Tech Co., Ltd. of the system kitchen
House Tech Co., Ltd. of the system kitchen

Local photos, including front road

Local photos, including front road. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Shopping centre

Shopping centre. Until es card Ushiku 1851m
Until es card Ushiku 1851m

Other introspection

Other introspection. Same specifications
Same specifications

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.
The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.

Power generation ・ Hot water equipment

Power generation ・ Hot water equipment. House Tech Co., Ltd. Unit is a bus.
House Tech Co., Ltd. Unit is a bus.

Other introspection

Other introspection. Same specifications
Same specifications

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.
By sandwiching the packing material between the foundation and the concrete is the basis packing method, Gap-making between the foundation and the concrete, It is a method of ensuring breathability.

Cooling and heating ・ Air conditioning

Cooling and heating ・ Air conditioning. It is with a bathroom drying function.
It is with a bathroom drying function.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. The outer wall foundation of conventional shaft assembly method, Seismic board "Dairaito"
The outer wall foundation of conventional shaft assembly method, Seismic board "Dairaito"

Other Equipment

Other Equipment. The Company has adopted a multi-layer glass.
The Company has adopted a multi-layer glass.

Other

Other. In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.
In addition to the seller of the security 10 years (such as the major structural part structural strength on the main part), Based on the home warranty fulfillment method, We become so any chance the seller repair, etc. of the defect is performed reliably even if the bankruptcy.

Other. Thermal insulation of residential ・ For durability, etc., It also carried out by inspection of the third-party organization for the flat 35 corresponding clearing the technical standards housing in the Housing Finance Agency.
Thermal insulation of residential ・ For durability, etc., It also carried out by inspection of the third-party organization for the flat 35 corresponding clearing the technical standards housing in the Housing Finance Agency.

Other. Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.
Using a large three-dimensional vibration table test facility at the Public Works Research Institute, Hanshin ・ The vibration (seismic intensity 7 equivalent) is added corresponds to Awaji Earthquake, Verification of the degree of damage of the building and, We confirmed that the seismic performance is present in sufficient.

Other. All building both before start of construction, We conducted a ground survey by research company.
All building both before start of construction, We conducted a ground survey by research company.

Other. The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.
The Company has adopted a solid foundation of earthquake-resistant structures. The solid foundation that uses a lot of rebar and concrete, There is a difficult feature to subsidence building compared to traditional cloth foundation.

Other. The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".
The outer wall foundation of strong seismic board "Dairaito" conventional shaft assembly method to earthquake and fire, We use earthquake-resistant board "Dairaito".

Other. In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance.
In order to increase the strength of the junction of the wooden house, Use the performance certified hardware on key points, We do devised to improve the earthquake resistance.



Location