New Homes » Tohoku » Iwate Prefecture » Kitakami


Iwate Prefecture Kitakami
JR Kitakami Line "Yanagihara" walk 21 minutes
Now 1 building after. We are the Iwate prefectural housing Festival of company. That of new ready-built house, OK north from the village Takizawa south to north City. Please leave. Complete listing ・ Structure visit at any time during the corresponding
After 1 building. There are new homes in wood utilization point object properties (300,000 points) Kitakami Ueno-cho. Sale ends at first-come-first-served basis. There is confidence in our alliance loan. If length of service is shorter, If you are concerned about the self-financing, Husband and wife share name, If you are interested in revenue combined, Those contemplating the parent-child pairs loan or a parent-child relay. It is in the handling of reconstruction assistance mortgage. That the property, Thing of the loan, Please feel free to contact us. First of all please from the document request.
Features pickup
Design house performance with evaluation / Measures to conserve energy / Corresponding to the flat-35S / Vibration Control ・ Seismic isolation ・ Earthquake resistant / Year Available / Parking two Allowed / Land 50 square meters or more / Energy-saving water heaters / System kitchen / Bathroom Dryer / All room storage / A quiet residential area / Japanese-style room / Shaping land / Washbasin with shower / Face-to-face kitchen / Security enhancement / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / 2 or more sides balcony / South balcony / Double-glazing / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / TV monitor interphone / Storeroom
Price
20.8 million yen
Floor plan
4LDK + S (storeroom)
Units sold
1 units
Land area
167.73 sq m (50.73 tsubo) (measured)
Building area
95.17 sq m (28.78 tsubo) (measured)
Driveway burden-road
Nothing, North 6m width
Completion date
December 2013
Address
Iwate Prefecture Kitakami Ueno-cho 1
Traffic
JR Kitakami Line "Yanagihara" walk 21 minutes
JR Tohoku Line "north" walk 28 minutes
Iwate Prefecture traffic "Ueno town" walk 3 minutes
Contact
TEL: 019-651-6803 Please inquire as "saw SUUMO (Sumo)"
Building coverage, floor area ratio
Fifty percent ・ 80%
Time residents
December 2013
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One low-rise
Other limitations
Regulations have by the Landscape Act
Overview and notices
Facilities: Public Water Supply, This sewage, Individual LPG, Building confirmation number: No. H25SHC112969, Parking: car space
Company profile
<Mediation> Iwate Governor (2) No. 002322 (Ltd.) Rocks Yubinbango020-0022 Morioka, Iwate Prefecture Odori 1-1-16 Iwate Education Center


Same specifications photos (appearance)

Same specifications photos (appearance). It has been adopted as standard luck outside insulation construction method in cold weather model, Sash is using the Low-E glass. Double-glazing is also guaranteed. First from please feel free to Request.
It has been adopted as standard luck outside insulation construction method in cold weather model, Sash is using the Low-E glass. Double-glazing is also guaranteed. First from please feel free to Request.

Floor plan

Floor plan. 20.8 million yen, 4LDK + S (storeroom), Land area 167.73 sq m , It is a building area of ​​95.17 sq m warranty fulfillment method is applied Property. Guarantee is not an insurance company, The Company has adopted all the properties of the deposit money system by the Legal Affairs Bureau. Please feel free to contact us because there detailed documentation.
20.8 million yen, 4LDK + S (storeroom), Land area 167.73 sq m , It is a building area of ​​95.17 sq m warranty fulfillment method is applied Property. Guarantee is not an insurance company, The Company has adopted all the properties of the deposit money system by the Legal Affairs Bureau. Please feel free to contact us because there detailed documentation.

Other

Other. It is safe of housing performance evaluation properties (such as housing report of). design ・ Issue a performance evaluation report of construction, Get the 3 of seismic grade is the highest grade, Other wind-resistant also, Degradation measures, Peace of mind over the maintenance, etc. variety ・ We conducted a third-party inspection of enhancement.
It is safe of housing performance evaluation properties (such as housing report of). design ・ Issue a performance evaluation report of construction, Get the 3 of seismic grade is the highest grade, Other wind-resistant also, Degradation measures, Peace of mind over the maintenance, etc. variety ・ We conducted a third-party inspection of enhancement.

Other. Same specifications: Basic performs a ground improvement based on the contents of the ground survey is the solid foundation standard. Various piping is exposed, Maintenance is easy. Please feel the care homes to degradation measures and maintenance. (Saturday is not a bare foundation)
Same specifications: Basic performs a ground improvement based on the contents of the ground survey is the solid foundation standard. Various piping is exposed, Maintenance is easy. Please feel the care homes to degradation measures and maintenance. (Saturday is not a bare foundation)

Other. For cold climates: the specification, The Company has adopted the external insulation construction method in the standard. Of course, the inner insulation ・ Under the floor, There is also a heat-insulating material in the ceiling. Structure ・ Complete listing visit Allowed.
For cold climates: the specification, The Company has adopted the external insulation construction method in the standard. Of course, the inner insulation ・ Under the floor, There is also a heat-insulating material in the ceiling. Structure ・ Complete listing visit Allowed.

Other. Wood is a usage point object properties. Also, Because of the seismic performance improvement, We meet the earthquake resistance standards to Tightened the member and the seismic dedicated hardware. Since there is more information about materials, Please contact us.
Wood is a usage point object properties. Also, Because of the seismic performance improvement, We meet the earthquake resistance standards to Tightened the member and the seismic dedicated hardware. Since there is more information about materials, Please contact us.



Location