New Homes » Tohoku » Iwate Prefecture » Morioka


Morioka, Iwate Prefecture
Iwate Galaxy Railway Line "Aoyama" walk 29 minutes
Live if still garden newly built single-family: wood utilization point target housing (300,000 points): Following the first site Morioka Nakatsutsumi cho, This new homes imposing complete.
Sorry I made you wait, Is the new homes completed in Morioka Nakatsutsumi cho. There is confidence in our alliance loan interest rate preferential ◎ wood utilization point object properties (300,000 P) assurance system adopts the deposit system for peace of mind. There is confidence in building performance due to cost-effectiveness. First from please feel free to Request.
Features pickup
Measures to conserve energy / Corresponding to the flat-35S / Solar power system / Pre-ground survey / Seismic fit / Year Available / Parking two Allowed / Immediate Available / 2 along the line more accessible / Energy-saving water heaters / Super close / It is close to the city / Yang per good / All room storage / LDK15 tatami mats or more / Around traffic fewer / Or more before road 6m / Japanese-style room / Face-to-face kitchen / Security enhancement / Toilet 2 places / 2-story / Double-glazing / Nantei / Water filter / In a large town / Flat terrain / Development subdivision in
Price
20.8 million yen
Floor plan
4LDK
Units sold
1 units
Land area
251.96 sq m (76.21 tsubo) (measured)
Building area
94.76 sq m (28.66 tsubo) (measured)
Driveway burden-road
Nothing, East 6m width
Completion date
November 2013
Address
Morioka, Iwate Prefecture Nakatsutsumi cho
Traffic
Iwate Galaxy Railway Line "Aoyama" walk 29 minutes
Iwate Prefecture traffic "Minami Nagahashi" walk 4 minutes
Contact
TEL: 019-651-6803 Please inquire as "saw SUUMO (Sumo)"
Building coverage, floor area ratio
Fifty percent ・ 80%
Time residents
Immediate available
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One low-rise
Other limitations
Regulations have by the Landscape Act, Height ceiling Yes
Overview and notices
Facilities: Public Water Supply, This sewage, Individual LPG, Building confirmation number: No. H25SHC112103, Parking: car space
Company profile
<Mediation> Iwate Governor (2) No. 002322 (Ltd.) Rocks Yubinbango020-0022 Morioka, Iwate Prefecture Odori 1-1-16 Iwate Education Center


Same specifications photos (appearance)

Same specifications photos (appearance). Same specifications: The complete building. Please try to experience a different house of personality. Simple = Do not Dattari mast?
Same specifications: The complete building. Please try to experience a different house of personality. Simple = Do not Dattari mast?

Other

Other. This warranty fulfillment method properties of peace of mind. (Guarantee has adopted a deposit system) adopt a maintenance support system at a professional call center.
This warranty fulfillment method properties of peace of mind. (Guarantee has adopted a deposit system) adopt a maintenance support system at a professional call center.

Other. Wood is a usage point object properties. Also, Because of the seismic performance improvement, We meet the earthquake resistance standards to Tightened the member and the seismic dedicated hardware. Since there is more information about materials, Please contact us.
Wood is a usage point object properties. Also, Because of the seismic performance improvement, We meet the earthquake resistance standards to Tightened the member and the seismic dedicated hardware. Since there is more information about materials, Please contact us.

Floor plan

Floor plan. 20.8 million yen, 4LDK, Land area 251.96 sq m , There is a building area of ​​94.76 sq m south feeling of freedom, It is also nice barbecue at the site of about 76 square meters ◎ we have design books available. Please feel free to tell us.
20.8 million yen, 4LDK, Land area 251.96 sq m , There is a building area of ​​94.76 sq m south feeling of freedom, It is also nice barbecue at the site of about 76 square meters ◎ we have design books available. Please feel free to tell us.

Other

Other. Same specifications: construction cases Make the ground improvement based on the contents of the ground survey. Foundation is a solid foundation standard. Various piping is exposed, Maintenance is easy. Please feel the care homes to degradation measures and maintenance.
Same specifications: construction cases Make the ground improvement based on the contents of the ground survey. Foundation is a solid foundation standard. Various piping is exposed, Maintenance is easy. Please feel the care homes to degradation measures and maintenance.

Other. Same specifications: cold weather model standard: we have adopted the external insulation construction method. Also implement the entire circumference ventilation by utilizing the basic packing, Seismic performance also have confidence.
Same specifications: cold weather model standard: we have adopted the external insulation construction method. Also implement the entire circumference ventilation by utilizing the basic packing, Seismic performance also have confidence.



Location