New Homes » Tohoku » Iwate Prefecture » Morioka


Morioka, Iwate Prefecture
JR Yamada Line "Yamagishi" walk 28 minutes
New Specifications: wood utilization point object properties (300,000 P) confidence have in our cooperation loan interest rate preferential ◎ assurance system adopts a deposit system for peace of mind. There is confidence in building performance due to cost-effectiveness. First, from the document request.
Wood utilization point object properties: under construction in Morioka Mitsuwari, Ground survey Performed. Peace of mind of seismic experiment already ・ Safe housing. Outside insulation ・ Strong Dairaito wall in earthquake ・ We have construction at a solid foundation and basic packing. First of all please from the document request. Our tie-up loan also I am popular (you Kaikae, Length of service and self-financing, Please feel free to contact us to loan refinancing)
Features pickup
Measures to conserve energy / Corresponding to the flat-35S / Airtight high insulated houses / Pre-ground survey / Vibration Control ・ Seismic isolation ・ Earthquake resistant / Parking two Allowed / Land 50 square meters or more / Fiscal year Available / Energy-saving water heaters / System kitchen / Bathroom Dryer / All room storage / Japanese-style room / Shaping land / Washbasin with shower / Face-to-face kitchen / Security enhancement / Barrier-free / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / 2 or more sides balcony / South balcony / Double-glazing / Warm water washing toilet seat / Nantei / Underfloor Storage / The window in the bathroom / TV monitor interphone / Leafy residential area / Water filter / Storeroom
Price
22,800,000 yen
Floor plan
4LDK + 2S (storeroom)
Units sold
1 units
Land area
172.87 sq m (52.29 tsubo) (measured)
Building area
96.39 sq m (29.15 tsubo) (measured)
Driveway burden-road
Nothing, West 4m width
Completion date
February 2013
Address
Morioka, Iwate Prefecture Mitsuwari 5
Traffic
JR Yamada Line "Yamagishi" walk 28 minutes
JR Yamada Line "Kamimorioka" walk 33 minutes
Iwate Prefecture traffic "prefectural baseball field before" walk 10 minutes
Contact
TEL: 019-651-6803 Please inquire as "saw SUUMO (Sumo)"
Building coverage, floor area ratio
Fifty percent ・ 80%
Time residents
February 2014 schedule
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Other limitations
Regulations have by the Landscape Act
Overview and notices
Facilities: Public Water Supply, This sewage, Individual LPG, Building confirmation number: No. H25SHC117416, Parking: car space
Company profile
<Mediation> Iwate Governor (2) No. 002322 (Ltd.) Rocks Yubinbango020-0022 Morioka, Iwate Prefecture Odori 1-1-16 Iwate Education Center


Same specifications photos (appearance)

Same specifications photos (appearance). Reconstruction assistance loan handling in, We are very well received for reconstruction assistance adding donations procedure. Please experience the robust building.
Reconstruction assistance loan handling in, We are very well received for reconstruction assistance adding donations procedure. Please experience the robust building.

Floor plan

Floor plan. 22,800,000 yen, 4LDK + 2S (storeroom), Land area 172.87 sq m , It is a building area of ​​96.39 sq m wood utilization point object properties. Also, Because of the seismic performance improvement, We meet the earthquake resistance standards to Tightened the member and the seismic dedicated hardware. Since there is more information about materials, Please contact us.
22,800,000 yen, 4LDK + 2S (storeroom), Land area 172.87 sq m , It is a building area of ​​96.39 sq m wood utilization point object properties. Also, Because of the seismic performance improvement, We meet the earthquake resistance standards to Tightened the member and the seismic dedicated hardware. Since there is more information about materials, Please contact us.

Other

Other. Same specifications: Basic performs a ground improvement based on the contents of the ground survey is the solid foundation standard. Various piping is exposed, Maintenance is easy. Please feel the care homes to degradation measures and maintenance. (Saturday is not a bare foundation)
Same specifications: Basic performs a ground improvement based on the contents of the ground survey is the solid foundation standard. Various piping is exposed, Maintenance is easy. Please feel the care homes to degradation measures and maintenance. (Saturday is not a bare foundation)

Other. For cold climates: the specification, The Company has adopted the external insulation construction method in the standard. Of course, the inner insulation ・ Under the floor, There is also a heat-insulating material in the ceiling. Structure ・ Complete listing visit Allowed.
For cold climates: the specification, The Company has adopted the external insulation construction method in the standard. Of course, the inner insulation ・ Under the floor, There is also a heat-insulating material in the ceiling. Structure ・ Complete listing visit Allowed.

Other. We are the Iwate prefectural housing Festival of company. Please leave things your new construction spec home. Complete listing ・ Structure tour is at any time corresponding in.
We are the Iwate prefectural housing Festival of company. Please leave things your new construction spec home. Complete listing ・ Structure tour is at any time corresponding in.

Other. Guarantee has adopted the Legal Affairs Bureau deposit system. This warranty fulfillment method is applied properties of the peace of mind. Please request more documentation. of course, Structure tour ・ Preview also from time to time corresponding in (even on weekdays)
Guarantee has adopted the Legal Affairs Bureau deposit system. This warranty fulfillment method is applied properties of the peace of mind. Please request more documentation. of course, Structure tour ・ Preview also from time to time corresponding in (even on weekdays)

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Same specifications: We the luck outside insulation construction method in cold weather model adopted by the standard. Sash is using the Low-E glass. Double-glazing is also guaranteed. First from please feel free to Request.
Same specifications: We the luck outside insulation construction method in cold weather model adopted by the standard. Sash is using the Low-E glass. Double-glazing is also guaranteed. First from please feel free to Request.

Construction ・ Construction method ・ specification. One of Kore of the seismic performance improvement, We use seismic dedicated hardware in the standard. Protect your family firmly in the robust building. Since there is more information about materials, Please contact us.
One of Kore of the seismic performance improvement, We use seismic dedicated hardware in the standard. Protect your family firmly in the robust building. Since there is more information about materials, Please contact us.



Location