New Homes » Tohoku » Iwate Prefecture » Shiwa District


Iwate Prefecture Shiwa-gun Shiwa
JR Tohoku Line "hoof" walk 11 minutes
Live if still garden newly built single-family: with solar power: Eco house ・ Soku, Occupancy possible: reconstruction assistance loan handling in, We are very well received for reconstruction assistance adding donations procedure.
Price change: Eco with solar power generation house: ground survey completed. Peace of mind of seismic experiment already ・ Safe housing. Outside insulation ・ Strong Dairaito wall in earthquake ・ We have construction at a solid foundation and basic packing. First of all please from the document request. Our tie-up loan also I am popular (you Kaikae, Length of service and self-financing, Please feel free to contact us to loan refinancing)
Features pickup
Measures to conserve energy / Corresponding to the flat-35S / Solar power system / Pre-ground survey / Vibration Control ・ Seismic isolation ・ Earthquake resistant / Year Available / Parking two Allowed / Immediate Available / Land 50 square meters or more / Energy-saving water heaters / It is close to the city / System kitchen / Bathroom Dryer / All room storage / Flat to the station / A quiet residential area / Or more before road 6m / Japanese-style room / Shaping land / garden / Washbasin with shower / Face-to-face kitchen / Security enhancement / Toilet 2 places / 2-story / Double-glazing / Zenshitsuminami direction / Warm water washing toilet seat / Nantei / Underfloor Storage / The window in the bathroom / TV monitor interphone / Leafy residential area / Mu front building / Water filter / Storeroom / Flat terrain / Development subdivision in
Price
17,900,000 yen
Floor plan
4LDK + 2S (storeroom)
Units sold
1 units
Total units
1 units
Land area
220.47 sq m (66.69 square meters)
Building area
98.01 sq m (29.64 tsubo) (measured)
Driveway burden-road
Nothing, West 8m width
Completion date
July 2013
Address
Iwate Prefecture Shiwa-gun Shiwa Machisakura-cho Urata
Traffic
JR Tohoku Line "hoof" walk 11 minutes
JR Tohoku Line "Shiwa center" walk 27 minutes
Contact
TEL: 019-651-6803 Please inquire as "saw SUUMO (Sumo)"
Building coverage, floor area ratio
Fifty percent ・ Hundred percent
Time residents
Immediate available
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One low-rise
Other limitations
Regulations have by the Landscape Act
Overview and notices
Facilities: Public Water Supply, This sewage, Individual LPG, Building confirmation number: No. H25SHC104497, Parking: car space
Company profile
<Mediation> Iwate Governor (2) No. 002322 (Ltd.) Rocks Yubinbango020-0022 Morioka, Iwate Prefecture Odori 1-1-16 Iwate Education Center


Same specifications photos (appearance)

Same specifications photos (appearance). Soku, Occupancy possible: reconstruction assistance loan handling in, We are very well received for reconstruction assistance adding donations procedure. Please experience the robust building.
Soku, Occupancy possible: reconstruction assistance loan handling in, We are very well received for reconstruction assistance adding donations procedure. Please experience the robust building.

Other

Other. Guarantee has adopted the Legal Affairs Bureau deposit system. This warranty fulfillment method is applied properties of the peace of mind. Please request more documentation. of course, Structure tour ・ Preview also from time to time corresponding in (even on weekdays)
Guarantee has adopted the Legal Affairs Bureau deposit system. This warranty fulfillment method is applied properties of the peace of mind. Please request more documentation. of course, Structure tour ・ Preview also from time to time corresponding in (even on weekdays)

Other. Same specifications: Basic performs a ground improvement based on the contents of the ground survey is the solid foundation standard. Various piping is exposed, Maintenance is easy. Please feel the care homes to degradation measures and maintenance. (Saturday is not a bare foundation)
Same specifications: Basic performs a ground improvement based on the contents of the ground survey is the solid foundation standard. Various piping is exposed, Maintenance is easy. Please feel the care homes to degradation measures and maintenance. (Saturday is not a bare foundation)

Other. For cold climates: the specification, The Company has adopted the external insulation construction method in the standard. Of course, the inner insulation ・ Under the floor, There is also a heat-insulating material in the ceiling. Structure ・ Complete listing visit Allowed.
For cold climates: the specification, The Company has adopted the external insulation construction method in the standard. Of course, the inner insulation ・ Under the floor, There is also a heat-insulating material in the ceiling. Structure ・ Complete listing visit Allowed.

Other. One of Kore of the seismic performance improvement, We use seismic dedicated hardware in the standard. Protect your family firmly in the robust building. Since there is more information about materials, Please contact us.
One of Kore of the seismic performance improvement, We use seismic dedicated hardware in the standard. Protect your family firmly in the robust building. Since there is more information about materials, Please contact us.

Other Equipment

Other Equipment. It has been adopted as standard luck outside insulation construction method in cold weather model, Sash is using the Low-E glass. Double-glazing is also guaranteed. First from please feel free to Request.
It has been adopted as standard luck outside insulation construction method in cold weather model, Sash is using the Low-E glass. Double-glazing is also guaranteed. First from please feel free to Request.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Same specifications: construction cases Make the ground improvement based on the contents of the ground survey. Foundation is a solid foundation standard. Various piping is exposed, Maintenance is easy.
Same specifications: construction cases Make the ground improvement based on the contents of the ground survey. Foundation is a solid foundation standard. Various piping is exposed, Maintenance is easy.

Other Equipment

Other Equipment. There is also a cool breeze functions with happy dryer in unit bus (4 type switchable) course sitz bath can also. We look forward to your inquiry.
There is also a cool breeze functions with happy dryer in unit bus (4 type switchable) course sitz bath can also. We look forward to your inquiry.

Other Equipment. 1 ・ Second floor toilet standard equipment, It is also abundant thought outlet makeover. Large-capacity front door storage, Come: Please visit (also have guided corresponding weekdays)
1 ・ Second floor toilet standard equipment, It is also abundant thought outlet makeover. Large-capacity front door storage, Come: Please visit (also have guided corresponding weekdays)

Other Equipment. Same specifications: by solar panels standard mounting There are also electric power sales revenue while reducing the monthly electricity bill. Sash is we have a Low-E glass in the standard. come, look, Please, try to open and close.
Same specifications: by solar panels standard mounting There are also electric power sales revenue while reducing the monthly electricity bill. Sash is we have a Low-E glass in the standard. come, look, Please, try to open and close.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Price change. Eco house with solar power, Imposing completed in Shiwa Machisakura town. Ground survey Performed. Peace of mind of seismic experiment already ・ Safe housing. Outside insulation ・ Strong Dairaito wall in earthquake ・ Solid foundation and basic packing, Construction at an external insulation construction method. First of all please from the document request
Price change. Eco house with solar power, Imposing completed in Shiwa Machisakura town. Ground survey Performed. Peace of mind of seismic experiment already ・ Safe housing. Outside insulation ・ Strong Dairaito wall in earthquake ・ Solid foundation and basic packing, Construction at an external insulation construction method. First of all please from the document request

Construction ・ Construction method ・ specification. Now 1 buildings after thank you. It will be discontinued at the first-come-first-served basis. Because there More Information, Please feel free to contact us.  ※ External insulation and solar power generation with eco-housing: site area of ​​about 66 square meters: closet with two places
Now 1 buildings after thank you. It will be discontinued at the first-come-first-served basis. Because there More Information, Please feel free to contact us. ※ External insulation and solar power generation with eco-housing: site area of ​​about 66 square meters: closet with two places



Location