New Homes » Kansai » Osaka prefecture » Sakai, Higashi-ku


Sakai, Osaka, Higashi-ku,
Nankai Koya Line "Hagiharatenjin" walk 5 minutes
◆ Local tours ・ It is a mortgage briefing held in. ◆ Down payment $ 0, Full loan is possible. ◆ Our day, seven days a week! This tour OK until 9 pm. [Makoto Corporation] Please leave to Nakazawa.
Features pickup
Year Available / Super close / It is close to the city / System kitchen / Yang per good / All room storage / Flat to the station / A quiet residential area / LDK15 tatami mats or more / Around traffic fewer / Japanese-style room / Idyll / Washbasin with shower / Face-to-face kitchen / Barrier-free / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / Ventilation good / All living room flooring / Dish washing dryer / Water filter / City gas / All rooms are two-sided lighting / Development subdivision in
Event information
Also Makoto group nor building sale seller
Price
27,800,000 yen
Floor plan
4LDK
Units sold
1 units
Total units
1 units
Land area
88 sq m
Building area
93 sq m
Driveway burden-road
Nothing, East 5m width
Completion date
February 2014
Address
Sakai, Osaka Prefecture, Higashi-ku, Hikishoharadera cho
Traffic
Nankai Koya Line "Hagiharatenjin" walk 5 minutes
Nankai Koya Line "Hatsushiba" walk 15 minutes
Nankai Koya Line "Kitanoda" walk 32 minutes
Related links
[Related Sites of this company]
Person in charge
Rep Masayuki Nakazawa
Contact
(Corporation) Makoto Corporation Real Estate Information Center TEL: 0800-603-3143 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
60% ・ 200%
Time residents
Three months after the contract
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
Two mid-high
Other limitations
Regulations have by the Landscape Act, Quasi-fire zones
Overview and notices
Contact: Masayuki Nakazawa, Facilities: Public Water Supply, This sewage, City gas, Building confirmation number: 13-2626, Parking: car space
Company profile
<Mediation> governor of Osaka (2) No. 049170 (Corporation) Makoto Corporation Real Estate Information Center Yubinbango591-8044 Sakai-shi, Osaka, Kita-ku, Nakanagao cho 4-5-21


Same specifications photos (appearance)

Same specifications photos (appearance). Construction image
Construction image

Same specifications photo (bathroom)

Same specifications photo (bathroom). TOTO Sazana Bathtub as well as, The floor is also a heat insulating material adoption, Do not miss the heat from anywhere in the bathroom. Play a role in energy conservation! ! ● floor insulation specification ● warm tub ● swish swish and clean water outlet ● relieved KARARI floor
TOTO Sazana Bathtub as well as, The floor is also a heat insulating material adoption, Do not miss the heat from anywhere in the bathroom. Play a role in energy conservation! ! ● floor insulation specification ● warm tub ● swish swish and clean water outlet ● relieved KARARI floor

Same specifications photo (kitchen)

Same specifications photo (kitchen). Cleanup Corporation CREAN LADY A kitchen that could not be recycled in a wooden cabinet by the "eco cabinet" made of stainless steel Cleanup will contribute to the global environment. Quality to the part which is not visible stainless. So, Cleanliness, Long life, Eco
Cleanup Corporation CREAN LADY A kitchen that could not be recycled in a wooden cabinet by the "eco cabinet" made of stainless steel Cleanup will contribute to the global environment. Quality to the part which is not visible stainless. So, Cleanliness, Long life, Eco

Same specifications photos (living)

Same specifications photos (living). Because it is taken widely for more than 15 mats a living, I think whether time of family reunion is fun moments.
Because it is taken widely for more than 15 mats a living, I think whether time of family reunion is fun moments.

Wash basin, toilet

Wash basin, toilet. Rikushiru W = 900
Rikushiru W = 900

Same specifications photos (Other introspection)

Same specifications photos (Other introspection). The Japanese-style room is convenient to the tone of the blindfold and the light from the outside on the mounting a sliding door in the standard equipment.
The Japanese-style room is convenient to the tone of the blindfold and the light from the outside on the mounting a sliding door in the standard equipment.

Other

Other. TOTO
TOTO

Other. Directed the pomp of brightness and looks at the entrance hall of the marble has to produce a welcome at Good residential.
Directed the pomp of brightness and looks at the entrance hall of the marble has to produce a welcome at Good residential.

Other. Sometimes more will further enhance the atmosphere of the house out a profound feeling that to tiling around the front door.
Sometimes more will further enhance the atmosphere of the house out a profound feeling that to tiling around the front door.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. In also with regard to rebar that becomes a framework of basic Corporation, Although it has a diameter of 1 centimeter of rebar to be arranged in a 30 centimeter interval, We are a 20 centimeter interval diameter 1.3 cm of rebar, The diameter of the rebar is large arrangement interval will work in close, Also has to be a strong foundation than Corporation specifications 1.3 centimeters of rebar as a two by two each for the rebar to support the head and the bottom (see our Specifications Figure). This 2-story, 3 has been adopted as our basic standard specifications regardless of the story.
In also with regard to rebar that becomes a framework of basic Corporation, Although it has a diameter of 1 centimeter of rebar to be arranged in a 30 centimeter interval, We are a 20 centimeter interval diameter 1.3 cm of rebar, The diameter of the rebar is large arrangement interval will work in close, Also has to be a strong foundation than Corporation specifications 1.3 centimeters of rebar as a two by two each for the rebar to support the head and the bottom (see our Specifications Figure). This 2-story, 3 has been adopted as our basic standard specifications regardless of the story.

Construction ・ Construction method ・ specification. General cloth foundation has weak weakness to differential settlement. Our foundation has adopted a solid foundation, Displacement of basic due to uneven settlement because it supports the entire thickness of 18 cm one of the bottom panel of the house does not occur first. Solid foundation strongly to differential settlement, There is also the effect of preventing termite, To prevent the moisture from the ground rises. Shape is the same as the basic shape, which has been adopted by the Corporation, but the bottom panel with a thickness of 3 cm, In embedment of the outer periphery (depth to be embedded in the ground) will not exceed 6 cm.
General cloth foundation has weak weakness to differential settlement. Our foundation has adopted a solid foundation, Displacement of basic due to uneven settlement because it supports the entire thickness of 18 cm one of the bottom panel of the house does not occur first. Solid foundation strongly to differential settlement, There is also the effect of preventing termite, To prevent the moisture from the ground rises. Shape is the same as the basic shape, which has been adopted by the Corporation, but the bottom panel with a thickness of 3 cm, In embedment of the outer periphery (depth to be embedded in the ground) will not exceed 6 cm.

Construction ・ Construction method ・ specification. Joint force is to focus on, such as during an earthquake (foundation and pillar, Use the seismic hardware to the pillars and beams, etc.).
Joint force is to focus on, such as during an earthquake (foundation and pillar, Use the seismic hardware to the pillars and beams, etc.).

Construction ・ Construction method ・ specification. Formerly a joist construction method (1 × floor magnification), Through the joist-less method (floor magnification 1.2 times), It has adopted a joist less four laps nailing method (floor magnification three times) from April 2008. The evolution to the direction in which the structure is strongly we give priority to safety.
Formerly a joist construction method (1 × floor magnification), Through the joist-less method (floor magnification 1.2 times), It has adopted a joist less four laps nailing method (floor magnification three times) from April 2008. The evolution to the direction in which the structure is strongly we give priority to safety.

Construction ・ Construction method ・ specification. The framework and the axis of pairs of coupled construction method that structural plywood to be used in load-bearing wall and (JAS standard product) was used both the brace to be used in the conventional method of construction in the 2 × 4 construction method to all outer wall, It has a structure to a more stubborn.
The framework and the axis of pairs of coupled construction method that structural plywood to be used in load-bearing wall and (JAS standard product) was used both the brace to be used in the conventional method of construction in the 2 × 4 construction method to all outer wall, It has a structure to a more stubborn.

Construction ・ Construction method ・ specification. Pillar is contained in the interval of basic 90cm (2 times that of conventional). Liang is using a larger with a margin rather than the structural calculation the last minute. That all of the columns and beams is using the engineering Wood.
Pillar is contained in the interval of basic 90cm (2 times that of conventional). Liang is using a larger with a margin rather than the structural calculation the last minute. That all of the columns and beams is using the engineering Wood.



Location