New Homes » Kansai » Osaka prefecture » Sakai city north district


Sakai, Osaka, Kita-ku,
Subway Midosuji Line "Shinkanaoka" bus 10 field ToAyumi 9 minutes
◆ Local tours ・ It is a mortgage briefing held in. ◆ Down payment $ 0, Full loan is possible. ◆ Our day, seven days a week! This tour OK until 9 pm. [Makoto Corporation] Please leave to Nakazawa.
[Ask me for many surrounding environment] Newly built single-family this price! It was completed two front road 6.7m garage space. Please come to see us! Please feel free to contact us.
Features pickup
Measures to conserve energy / Solar power system / Pre-ground survey / Year Available / Parking two Allowed / Energy-saving water heaters / It is close to the city / System kitchen / Bathroom Dryer / Yang per good / All room storage / Flat to the station / A quiet residential area / LDK15 tatami mats or more / Or more before road 6m / Japanese-style room / Shaping land / Washbasin with shower / Face-to-face kitchen / Wide balcony / Barrier-free / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / South balcony / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / TV monitor interphone / Leafy residential area / Urban neighborhood / Ventilation good / All living room flooring / Good view / Or more ceiling height 2.5m / All room 6 tatami mats or more / Water filter / City gas / All rooms are two-sided lighting / Flat terrain / Development subdivision in / Readjustment land within
Event information
(Please be sure to ask in advance)
Price
17.8 million yen ~ 21,800,000 yen
Floor plan
3LDK + S (storeroom) ~ 4LDK
Units sold
8 units
Total units
8 units
Land area
100 sq m ~ 104.68 sq m
Building area
93.15 sq m ~ 95.98 sq m
Completion date
October 2013
Address
Sakai, Osaka, Kita-ku, Noto-cho
Traffic
Subway Midosuji Line "Shinkanaoka" bus 10 field ToAyumi 9 minutes
Related links
[Related Sites of this company]
Person in charge
Rep Masayuki Nakazawa
Contact
(Corporation) Makoto Corporation Real Estate Information Center TEL: 0800-603-3143 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
Kenpei rate: 60%, Volume ratio: 200%
Time residents
Immediate available
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
Semi-industrial
Land category
Residential land
Other limitations
Quasi-fire zones
Overview and notices
Contact: Masayuki Nakazawa
Company profile
<Mediation> governor of Osaka (2) No. 049170 (Corporation) Makoto Corporation Real Estate Information Center Yubinbango591-8044 Sakai-shi, Osaka, Kita-ku, Nakanagao cho 4-5-21


Same specifications photos (appearance)

Same specifications photos (appearance). ● plays a major role in harmony with the fire protection ● thermal insulation modern impression making landscape.
● plays a major role in harmony with the fire protection ● thermal insulation modern impression making landscape.

Kitchen

Kitchen. Same specifications Simple design omits a good waste of usability.
Same specifications Simple design omits a good waste of usability.

Bathroom

Bathroom. Same specifications 1616 size
Same specifications 1616 size

Living

Living. Enforcement example Because it is taken widely for more than 15 mats a living, I think whether time of family reunion is fun moments.
Enforcement example Because it is taken widely for more than 15 mats a living, I think whether time of family reunion is fun moments.

Same specifications photos (Other introspection)

Same specifications photos (Other introspection). Japanese style room
Japanese style room

Local appearance photo

Local appearance photo. Front road 6.7m
Front road 6.7m

Same specifications photos (Other introspection)

Same specifications photos (Other introspection). TOTO
TOTO

Other

Other. Sometimes more will further enhance the atmosphere of the house out a profound feeling that to tiling around the front door.
Sometimes more will further enhance the atmosphere of the house out a profound feeling that to tiling around the front door.

Shopping centre

Shopping centre. 2000m to Don Quixote
2000m to Don Quixote

Other Environmental Photo

Other Environmental Photo. Shinkanaoka 2300m before Station
Shinkanaoka 2300m before Station

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. In also with regard to rebar that becomes a framework of basic Corporation, Although it has a diameter of 1 centimeter of rebar to be arranged in a 30 centimeter interval, We are a 20 centimeter interval diameter 1.3 cm of rebar, The diameter of the rebar is large arrangement interval will work in close, Also has to be a strong foundation than Corporation specifications 1.3 centimeters of rebar as a two by two each for the rebar to support the head and the bottom (see our Specifications Figure). This 2-story, 3 has been adopted as our basic standard specifications regardless of the story.
In also with regard to rebar that becomes a framework of basic Corporation, Although it has a diameter of 1 centimeter of rebar to be arranged in a 30 centimeter interval, We are a 20 centimeter interval diameter 1.3 cm of rebar, The diameter of the rebar is large arrangement interval will work in close, Also has to be a strong foundation than Corporation specifications 1.3 centimeters of rebar as a two by two each for the rebar to support the head and the bottom (see our Specifications Figure). This 2-story, 3 has been adopted as our basic standard specifications regardless of the story.

Construction ・ Construction method ・ specification. General cloth foundation has weak weakness to differential settlement. Our foundation has adopted a solid foundation, Displacement of basic due to uneven settlement because it supports the entire thickness of 18 cm one of the bottom panel of the house does not occur first. Solid foundation strongly to differential settlement, There is also the effect of preventing termite, To prevent the moisture from the ground rises. Shape is the same as the basic shape, which has been adopted by the Corporation, but the bottom panel with a thickness of 3 cm, In embedment of the outer periphery (depth to be embedded in the ground) will not exceed 6 cm.
General cloth foundation has weak weakness to differential settlement. Our foundation has adopted a solid foundation, Displacement of basic due to uneven settlement because it supports the entire thickness of 18 cm one of the bottom panel of the house does not occur first. Solid foundation strongly to differential settlement, There is also the effect of preventing termite, To prevent the moisture from the ground rises. Shape is the same as the basic shape, which has been adopted by the Corporation, but the bottom panel with a thickness of 3 cm, In embedment of the outer periphery (depth to be embedded in the ground) will not exceed 6 cm.

Construction ・ Construction method ・ specification. Joint force is to focus on, such as during an earthquake (foundation and pillar, Use the seismic hardware to the pillars and beams, etc.).
Joint force is to focus on, such as during an earthquake (foundation and pillar, Use the seismic hardware to the pillars and beams, etc.).

Construction ・ Construction method ・ specification. Formerly a joist construction method (1 × floor magnification), Through the joist-less method (floor magnification 1.2 times), It has adopted a joist less four laps nailing method (floor magnification three times) from April 2008. The evolution to the direction in which the structure is strongly we give priority to safety.
Formerly a joist construction method (1 × floor magnification), Through the joist-less method (floor magnification 1.2 times), It has adopted a joist less four laps nailing method (floor magnification three times) from April 2008. The evolution to the direction in which the structure is strongly we give priority to safety.

Construction ・ Construction method ・ specification. The framework and the axis of pairs of coupled construction method that structural plywood to be used in load-bearing wall and (JAS standard product) was used both the brace to be used in the conventional method of construction in the 2 × 4 construction method to all outer wall, It has a structure to a more stubborn.
The framework and the axis of pairs of coupled construction method that structural plywood to be used in load-bearing wall and (JAS standard product) was used both the brace to be used in the conventional method of construction in the 2 × 4 construction method to all outer wall, It has a structure to a more stubborn.

Construction ・ Construction method ・ specification. Pillar is contained in the interval of basic 90cm (2 times that of conventional). Liang is using a larger with a margin rather than the structural calculation the last minute. That all of the columns and beams is using the engineering Wood.
Pillar is contained in the interval of basic 90cm (2 times that of conventional). Liang is using a larger with a margin rather than the structural calculation the last minute. That all of the columns and beams is using the engineering Wood.



Location