New Homes » Kansai » Osaka prefecture » Sakai City, Minami-ku


Sakai, Osaka Prefecture, Minami-ku,
Senboku high-speed rail "Komyoike" walk 28 minutes
Property name
The hills of Van Vert Komyoike
Price
28,380,000 yen ~ 34 million yen
Floor plan
4LDK
Units sold
3 units
Total units
132 units
Land area
120.63 sq m ~ 211.2 sq m (36.49 tsubo ~ 63.88 square meters)
Building area
95.87 sq m (29.00 tsubo) (measured)
Completion date
After the contract
Address
Sakai, Osaka Prefecture, Minami-ku, Mikitakami 951 1
Traffic
Senboku high-speed rail "Komyoike" walk 28 minutes
Related links
[Related Sites of this company]
Contact
Serukohomu TEL: 0120-95-2426 [Toll free] Please contact the "saw SUUMO (Sumo)"
Event information
Model room (please visitors to direct local) schedule / During the public time / 10:00 ~ 17:00 world-class standard energy-saving performance. Serukohomu of residential energy conservation ・ Earthquake-proof ・ And natural materials, Equipped to devise a comfortable life. From time to time held in even structure tours! The pros and cons of Serukohomu safety ・ Please check your house performance of safety on your own eyes. ※ Wednesday Closed ※ [Year-end and New Year holiday period] December 28 (Sat) ~ January 3 (Friday) New Year will be the opening of business than the afternoon January 4 (Saturday).
Most price range
27 million yen ・ 29 million yen ・ 30 million yen ・ 31 million yen ・ 32 million yen
Building coverage, floor area ratio
Building coverage: 50%, Volume ratio: 100%
Time residents
Consultation
Land of the right form
Ownership
Use district
Urbanization control area
Land category
Residential land
Overview and notices
Building Permits reason: land sale by the development permit, etc., Building confirmation number: No. H24 confirmation building near Ken No. 0,000,619, Development total area: 33.867.26 sq m
Company profile
<Marketing alliance (agency)> Minister of Land, Infrastructure and Transport (5) No. 4537 Construction license number / Minister of Land, Infrastructure and Transport (JP -19) No. 17573 (Company) National Building Lots and Buildings Transaction Business Association member (S) and Japan two-by-four construction Association Imported housing Industry Council member Serukohomu Osaka Minamiten Yubinbango594-1151 Osaka Izumi City Karakuni cho 2-7-57 <employer ・ Seller> governor of Osaka (1) No. 055995 (Ltd.) TM Corporation Yubinbango558-0042 Osaka-shi, Osaka Sumiyoshi-ku, Tonotsuji 2-2-8


Sale already cityscape photo

Sale already cityscape photo. First phase It is the streets of Banff compartment. A nice house is not lined.
First phase It is the streets of Banff compartment. A nice house is not lined.

Sale already cityscape photo. "Komyoike" station and "Toga ・ Between Miki many "station, Big Town of the total 132 compartment which is located near Komyoike. 4th sale start. Photo the first phase Montreal Street District. (June 2013 shooting)
"Komyoike" station and "Toga ・ Between Miki many "station, Big Town of the total 132 compartment which is located near Komyoike. 4th sale start. Photo the first phase Montreal Street District. (June 2013 shooting)

Other

Other. In green location reminiscent of the forest of overseas, Canada imported housing of Serukohomu boasts a sophisticated design and excellent housing performance is lined.
In green location reminiscent of the forest of overseas, Canada imported housing of Serukohomu boasts a sophisticated design and excellent housing performance is lined.

Local appearance photo

Local appearance photo. Local (April 2013) Shooting Local No. 50 land model house
Local (April 2013) Shooting Local No. 50 land model house

Aerial photograph

aerial photograph. Subdivision panoramic view (December 2012 shooting)
Subdivision panoramic view (December 2012 shooting)

Living

Living. Indoor (April 2013) Shooting Model house living. Solid flooring of natural warmth is felt.
Indoor (April 2013) Shooting Model house living. Solid flooring of natural warmth is felt.

Local appearance photo

Local appearance photo. Van Vert hill local / The first phase of sale district, Banff Street District. Nice streets, such as foreign. (June 2013 shooting)
Van Vert hill local / The first phase of sale district, Banff Street District. Nice streets, such as foreign. (June 2013 shooting)

Sale already cityscape photo

Sale already cityscape photo. Van Vert hill local / The first phase of sale district, Quebec City Street District (photo left), Charlevoix Street District (photo right). (June 2013 shooting)
Van Vert hill local / The first phase of sale district, Quebec City Street District (photo left), Charlevoix Street District (photo right). (June 2013 shooting)

Sale already cityscape photo. Van Vert hill local / The first phase of sale district, Quebec City Street District (photo right) Banff Street District (photo left). (July 2013 shooting)
Van Vert hill local / The first phase of sale district, Quebec City Street District (photo right) Banff Street District (photo left). (July 2013 shooting)

Local photos, including front road

Local photos, including front road. Stage II compartment that construction has been completed. Town in the road width 6.7m. Comfortable road that can pass leisurely car.
Stage II compartment that construction has been completed. Town in the road width 6.7m. Comfortable road that can pass leisurely car.

Exhibition hall / Showroom

exhibition hall / Showroom. Izumi center showroom was renewed this autumn. Senboku Line 1, Number one intersection next to a short in Karakuni. It will be able to experience the charm of Canada imported housing.
Izumi center showroom was renewed this autumn. Senboku Line 1, Number one intersection next to a short in Karakuni. It will be able to experience the charm of Canada imported housing.

exhibition hall / Showroom. Izumi center Showroom. It greets and enter the front door. Large living.
Izumi center Showroom. It greets and enter the front door. Large living.

exhibition hall / Showroom. Izumi center Showroom. Kitchen upcoming combines functionality and design. living, There is no dining and partition, It is spacious and airy with plenty.
Izumi center Showroom. Kitchen upcoming combines functionality and design. living, There is no dining and partition, It is spacious and airy with plenty.

exhibition hall / Showroom. Izumi center Showroom. Bright space facing the garden, which was extension in renewal. Elegant room in friendly atmosphere with plenty of natural with trees.
Izumi center Showroom. Bright space facing the garden, which was extension in renewal. Elegant room in friendly atmosphere with plenty of natural with trees.

Other Environmental Photo

Other Environmental Photo. NaruAkira 1100m walk 14 minutes to the Light kindergarten
NaruAkira 1100m walk 14 minutes to the Light kindergarten

Other Environmental Photo. Shiroyamadai to nursery school 1300m walk 17 minutes
Shiroyamadai to nursery school 1300m walk 17 minutes

Other Environmental Photo. Miki multi-elementary school until the 1500m walk 19 minutes
Miki multi-elementary school until the 1500m walk 19 minutes

Other Environmental Photo. Senboku high-speed rail "Komyoike" station walk 28 minutes
Senboku high-speed rail "Komyoike" station walk 28 minutes

Other Environmental Photo. Until Life Shiroyamadai shop 960m walk 12 minutes
Until Life Shiroyamadai shop 960m walk 12 minutes

Other Environmental Photo. Ion Komyoike to the store 1900m walk 24 minutes
Ion Komyoike to the store 1900m walk 24 minutes

Other
Other

Rendering (appearance)
Rendering (appearance)

Floor plan

Floor plan. Shiroyamadai to nursery school 1300m walk 17 minutes
Shiroyamadai to nursery school 1300m walk 17 minutes

Floor plan. Shiroyamadai to nursery school 1300m walk 17 minutes
Shiroyamadai to nursery school 1300m walk 17 minutes

Other Equipment

Other Equipment. wall ・ ceiling ・ On each floor is filled with a high-performance thermal insulation material, Insulating the whole house. By the synergistic effect of the high airtight sheet covering the insulation material has been achieved a good residence of heating efficiency.
wall ・ ceiling ・ On each floor is filled with a high-performance thermal insulation material, Insulating the whole house. By the synergistic effect of the high airtight sheet covering the insulation material has been achieved a good residence of heating efficiency.

Other Equipment. The ceiling, Original heat shield Serukohomu's proprietary ・ Installing a cool board. In this one, Provide a comfortable indoor space even in the summer. Higher thermal barrier in synergy with glass wool material filled in the ceiling ・ Thermal insulation performance is achieved.
The ceiling, Original heat shield Serukohomu's proprietary ・ Installing a cool board. In this one, Provide a comfortable indoor space even in the summer. Higher thermal barrier in synergy with glass wool material filled in the ceiling ・ Thermal insulation performance is achieved.

Other Equipment. In the window of Serukohomu is, Standard equipment transmitted how Low-E double glazing and heat about 1000 minutes 1 of resin sash of aluminum to exhibit about four times the insulating effect of the single-sheet glass.
In the window of Serukohomu is, Standard equipment transmitted how Low-E double glazing and heat about 1000 minutes 1 of resin sash of aluminum to exhibit about four times the insulating effect of the single-sheet glass.

Local guide map
Local guide map

Other Equipment. It was built housing in the 2 × 4 construction method, It boasts exceptional strength against earthquake. floor ・ wall ・ Since the roof to disperse the force received the shaking of an earthquake in the entire building of the monocoque structure that integrates, Collapse of seismic force is concentrated on the part happen ・ Damage, I very small.
It was built housing in the 2 × 4 construction method, It boasts exceptional strength against earthquake. floor ・ wall ・ Since the roof to disperse the force received the shaking of an earthquake in the entire building of the monocoque structure that integrates, Collapse of seismic force is concentrated on the part happen ・ Damage, I very small.

Other Environmental Photo

Other Environmental Photo. To Shiroyama Park 900m walk 12 minutes
To Shiroyama Park 900m walk 12 minutes

Other Environmental Photo. Until Kamodani park 2000m walk 25 minutes
Until Kamodani park 2000m walk 25 minutes

Other Environmental Photo. Until Kinki University Sakai hospital 2200m walk 28 minutes
Until Kinki University Sakai hospital 2200m walk 28 minutes



Location