New Homes » Kansai » Osaka prefecture » Sakai City, Minami-ku


Sakai, Osaka Prefecture, Minami-ku,
Senboku high-speed rail, "Toga ・ Miki many "bus 5 minutes Niwashirodai 4 ChoAyumi 1 minute
● Co., Ltd. Home Research Newly built single-family (consumption tax ・ Outside lecture cost included price) ● site with about 40 square meters. Parking two possible. ● about 6 mins position in the elementary and junior high schools. Your visits, Weekend course on weekdays is also available.
■ Site with about 40 square meters. Parking two possible. ■ Walk to elementary school 6 minutes. 1-minute walk from the junior high school. ■ Convenient adjacent also commercial facilities in Tsugabi Kita Station. ■ Room pair glass, The outer wall adopt your tour of the ALC concrete board, Saturdays, Sundays, and holidays, of course on weekdays is also available. I would like We take a look. Not please feel free to contact us.
Features pickup
Pre-ground survey / Parking two Allowed / It is close to golf course / System kitchen / Yang per good / A quiet residential area / LDK15 tatami mats or more / Around traffic fewer / Japanese-style room / Shaping land / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / Ventilation good / Dish washing dryer / Or more ceiling height 2.5m / Water filter / City gas
Event information
Local guide Board (Please be sure to ask in advance) schedule / During the public time / 10:00 ~ 18: 00 ● site with about 40 square meters. Parking two possible. ● 6-minute walk to elementary school. 1-minute walk from the junior high school. ● The Tsugabi Kita Station commercial facility is also convenient adjacent. ● fun just to imagine a new life of a quiet residential area is full. Please come by all means once the property please visit. Also because there are many new construction sale around the Sakai city at our company, Can you properties also will introduce to meet the conditions. Please feel free to contact us.
Price
29,800,000 yen
Floor plan
4LDK
Units sold
1 units
Total units
2 units
Land area
134.44 sq m (40.66 tsubo) (Registration)
Building area
94.16 sq m (28.48 square meters)
Driveway burden-road
Nothing
Completion date
February 2014
Address
Sakai, Osaka Prefecture, Minami-ku, Niwashirodai 1
Traffic
Senboku high-speed rail, "Toga ・ Miki many "bus 5 minutes Niwashirodai 4 ChoAyumi 1 minute
Related links
[Related Sites of this company]
Contact
(Ltd.) Home Research TEL: 0800-2003405 [Toll free] Please contact the "saw SUUMO (Sumo)"
Building coverage, floor area ratio
40% ・ 80%
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story
Use district
One low-rise
Overview and notices
Facilities: Public Water Supply, This sewage, City gas, Building confirmation number: 13-3515, Parking: car space
Company profile
<Mediation> governor of Osaka (2) No. 053058 (Ltd.) Home research Yubinbango599-8271 Osaka FuSakai City, Naka-ku, Fukaikita-cho, 3169 Makoto third building


Floor plan

Floor plan. 29,800,000 yen, 4LDK, Land area 134.44 sq m , Building area 94.16 sq m floor plan
29,800,000 yen, 4LDK, Land area 134.44 sq m , Building area 94.16 sq m floor plan

Local appearance photo

Local appearance photo. Appearance image
Appearance image

Local guide map
Local guide map

Kitchen

Kitchen. In the kitchen water purification function with faucet, Storage is the kitchen of the Cleanup of all drawer type. With dishwasher
In the kitchen water purification function with faucet, Storage is the kitchen of the Cleanup of all drawer type. With dishwasher

Living

Living. Popular face-to-face living in child-rearing households. Always it is possible to adjust the family and face, Increase the conversation of nature and family.
Popular face-to-face living in child-rearing households. Always it is possible to adjust the family and face, Increase the conversation of nature and family.

Bathroom

Bathroom. In unit bus of 1 pyeong type, It is the size that comfortably put in extending the leg. TOTO made, Thermos bathtub
In unit bus of 1 pyeong type, It is the size that comfortably put in extending the leg. TOTO made, Thermos bathtub

Local photos, including front road

Local photos, including front road. Local Photos
Local Photos

Wash basin, toilet

Wash basin, toilet. LIXIL made. Shower water washing.
LIXIL made. Shower water washing.

Primary school

Primary school. Niwashirodai until elementary school 480m
Niwashirodai until elementary school 480m

Junior high school

Junior high school. Niwashirodai 160m until junior high school
Niwashirodai 160m until junior high school

Supermarket

Supermarket. Until Izumiya 1120m
Until Izumiya 1120m

Shopping centre

Shopping centre. Until Cross Mall 1120m
Until Cross Mall 1120m

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Although the Corporation specification has become the rebar of the normal diameter 1cm be arranged at 30 cm intervals, We are a diameter 1.3 cm of rebar and 20 centimeter interval, We are working to strength up.
Although the Corporation specification has become the rebar of the normal diameter 1cm be arranged at 30 cm intervals, We are a diameter 1.3 cm of rebar and 20 centimeter interval, We are working to strength up.

Construction ・ Construction method ・ specification. Our foundation has adopted a solid foundation, Displacement of basic due to uneven settlement because it supports the entire thickness of 18 cm one of the bottom panel of the house does not occur first. Solid foundation strongly to differential settlement, There is also the effect of preventing termite, To prevent the moisture from the ground rises.
Our foundation has adopted a solid foundation, Displacement of basic due to uneven settlement because it supports the entire thickness of 18 cm one of the bottom panel of the house does not occur first. Solid foundation strongly to differential settlement, There is also the effect of preventing termite, To prevent the moisture from the ground rises.

Construction ・ Construction method ・ specification. By construction the basic packing between the foundation and the foundation, Corrosion of always ventilation is caught foundation, To prevent the occurrence of a termite.
By construction the basic packing between the foundation and the foundation, Corrosion of always ventilation is caught foundation, To prevent the occurrence of a termite.

Construction ・ Construction method ・ specification. It has adopted a joist less four laps nailing method (floor magnification three times) from April 2008. To previous from comparison and three times the direction in which the structure is strongly the evolution we give priority to safety. Foundation, Direct the beam, Paste the thickness 2.8 centimeter structural plywood of, To function the floor as the structural framework in that put a thickness 1.2 cm of floor finishing material, It has achieved a high strength.
It has adopted a joist less four laps nailing method (floor magnification three times) from April 2008. To previous from comparison and three times the direction in which the structure is strongly the evolution we give priority to safety. Foundation, Direct the beam, Paste the thickness 2.8 centimeter structural plywood of, To function the floor as the structural framework in that put a thickness 1.2 cm of floor finishing material, It has achieved a high strength.

Construction ・ Construction method ・ specification. In the framework and the axis of pairs of coupled construction method that structural plywood to be used in load-bearing wall and (JAS standard product) was used both the brace to be used in the conventional method of construction in the 2 × 4 construction method to all outer wall, Structure more stubbornly. earthquake, Against typhoon, It supports at twice the strength of a single method.
In the framework and the axis of pairs of coupled construction method that structural plywood to be used in load-bearing wall and (JAS standard product) was used both the brace to be used in the conventional method of construction in the 2 × 4 construction method to all outer wall, Structure more stubbornly. earthquake, Against typhoon, It supports at twice the strength of a single method.



Location