New Homes » Kansai » Osaka prefecture » Naka-ku, Sakai City


Osaka FuSakai City Naka-ku,
Senboku high-speed rail "Izumigaoka" bus 9 minutes countryside north exit bus stop walk 2 minutes
● Co., Ltd. Home research new construction property ・ consumption tax ・ Outside 構費 inclusive price ● all households site more than 36 square meters! Parking is also 2 ~ 3 units can be Saturdays, Sundays, and holidays, of course, is a weekday even Available tours. Please feel free to contact us
■ Fukai ・ Izumigaoka Line bus stop 3-minute walk. ■ There is also has formed a loose cityscape of 61 compartment park in the subdivision. ■ Garage is also happy to at the front road 6.7m There spacious! ■ In the local Ya 1 1 Kengaikan design, You can see the complete listing of a number of different floor plan. ■ South-facing Ya, There is also a corner lot compartment. You can immediately be announced. I would like We take a look. Not please feel free to contact us.
Features pickup
Pre-ground survey / Year Available / Parking two Allowed / System kitchen / Yang per good / All room storage / A quiet residential area / LDK15 tatami mats or more / Japanese-style room / Washbasin with shower / Face-to-face kitchen / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / Ventilation good / Dish washing dryer / Or more ceiling height 2.5m / All room 6 tatami mats or more / Water filter / City gas / Flat terrain / Development subdivision in
Event information
Open House (Please be sure to ask in advance) schedule / During the public time / 10:00 ~ 18: 00 ● all 61 compartments (consumption tax ・ Outside 構費 inclusive price) ● site more than 36 square meters! Parking is also available two or more. ● There is also a park in the subdivision! ● the entire road 6.7m There, You can see the spacious streets. ● There is also a south-facing or corner lot, etc., Guests tour the complete listing of each different floor plan. Since Saturday, Sunday and public holidays you can see of course even on weekdays, Not please feel free to contact us. Also because there are many new construction sale around the Sakai city at our company, Can you properties also will introduce to meet the conditions. Please feel free to contact us.
Price
22,800,000 yen
Floor plan
4LDK
Units sold
1 units
Total units
43 units
Land area
120.63 sq m (36.49 tsubo) (Registration)
Building area
93.15 sq m (28.17 tsubo) (Registration)
Driveway burden-road
Nothing, West 5.7m width
Completion date
May 2012
Address
Osaka FuSakai City Naka-ku, rural
Traffic
Senboku high-speed rail "Izumigaoka" bus 9 minutes countryside north exit bus stop walk 2 minutes
Senboku high-speed rail "deep" 8 minutes countryside north exit bus stop walk 2 minutes by bus
Related links
[Related Sites of this company]
Contact
(Ltd.) Home Research TEL: 0800-2003405 [Toll free] Please contact the "saw SUUMO (Sumo)"
Building coverage, floor area ratio
60% ・ Hundred percent
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
Urbanization control area
Overview and notices
Facilities: Public Water Supply, This sewage, City gas, Building Permits reason: land sale by the development permit, etc., Building confirmation number: 11-4733, Parking: car space
Company profile
<Mediation> governor of Osaka (2) No. 053058 (Ltd.) Home research Yubinbango599-8271 Osaka FuSakai City, Naka-ku, Fukaikita-cho, 3169 Makoto third building


Same specifications photos (appearance)

Same specifications photos (appearance). All 61 compartments! All houses 36 square meters or more of the clear compartment of! The entire road 6.7m spacious.
All 61 compartments! All houses 36 square meters or more of the clear compartment of! The entire road 6.7m spacious.

Local guide map

Local guide map. Local position Figure
Local position Figure

Local appearance photo

Local appearance photo. The outer wall to Asahi Kasei Hebel power board, It stuck stylish tile
The outer wall to Asahi Kasei Hebel power board, It stuck stylish tile

Floor plan

Floor plan. 22,800,000 yen, 4LDK, Land area 120.63 sq m , Building area 93.15 sq m
22,800,000 yen, 4LDK, Land area 120.63 sq m , Building area 93.15 sq m

Other local

Other local. Front road 6.7m spacious. All houses 36 square meters or more of a certain space on site.
Front road 6.7m spacious. All houses 36 square meters or more of a certain space on site.

Living

Living. Spacious Ribinku
Spacious Ribinku

Local appearance photo

Local appearance photo. You can see the different appearance of the design
You can see the different appearance of the design

Streets around

Streets around. Local entrance
Local entrance

Other

Other. Other Floor
Other Floor

Kitchen

Kitchen. In the kitchen water purification function with faucet, Storage is the kitchen of the Cleanup of all drawer type. With dishwasher
In the kitchen water purification function with faucet, Storage is the kitchen of the Cleanup of all drawer type. With dishwasher

Bathroom

Bathroom. In unit bus of 1 pyeong type, It is the size that comfortably put in extending the leg. TOTO made, Thermos bathtub
In unit bus of 1 pyeong type, It is the size that comfortably put in extending the leg. TOTO made, Thermos bathtub

Wash basin, toilet

Wash basin, toilet. Vanity wide size three-sided mirror, Panasonic. Shower Faucets
Vanity wide size three-sided mirror, Panasonic. Shower Faucets

Kindergarten ・ Nursery

kindergarten ・ Nursery. 120m to the west pottery nursery
120m to the west pottery nursery

Primary school

Primary school. 640m to the west pottery elementary school
640m to the west pottery elementary school

Hospital

Hospital. Berurando 880m to General Hospital
Berurando 880m to General Hospital

Other Environmental Photo

Other Environmental Photo. 1900m to Izumigaoka Station
1900m to Izumigaoka Station

Other Environmental Photo. 2400m until deep Station
2400m until deep Station

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Although the Corporation specification has become the rebar of the normal diameter 1cm be arranged at 30 cm intervals, We are a diameter 1.3 cm of rebar and 20 centimeter interval, We are working to strength up.
Although the Corporation specification has become the rebar of the normal diameter 1cm be arranged at 30 cm intervals, We are a diameter 1.3 cm of rebar and 20 centimeter interval, We are working to strength up.

Construction ・ Construction method ・ specification. Our foundation has adopted a solid foundation, Displacement of basic due to uneven settlement because it supports the entire thickness of 18 cm one of the bottom panel of the house does not occur first. Solid foundation strongly to differential settlement, There is also the effect of preventing termite, To prevent the moisture from the ground rises.
Our foundation has adopted a solid foundation, Displacement of basic due to uneven settlement because it supports the entire thickness of 18 cm one of the bottom panel of the house does not occur first. Solid foundation strongly to differential settlement, There is also the effect of preventing termite, To prevent the moisture from the ground rises.

Construction ・ Construction method ・ specification. By construction the basic packing between the foundation and the foundation, Corrosion of always ventilation is caught foundation, To prevent the occurrence of a termite.
By construction the basic packing between the foundation and the foundation, Corrosion of always ventilation is caught foundation, To prevent the occurrence of a termite.

Construction ・ Construction method ・ specification. It has adopted a joist less four laps nailing method (floor magnification three times) from April 2008. To previous from comparison and three times the direction in which the structure is strongly the evolution we give priority to safety. Foundation, Direct the beam, Paste the thickness 2.8 centimeter structural plywood of, To function the floor as the structural framework in that put a thickness 1.2 cm of floor finishing material, It has achieved a high strength.
It has adopted a joist less four laps nailing method (floor magnification three times) from April 2008. To previous from comparison and three times the direction in which the structure is strongly the evolution we give priority to safety. Foundation, Direct the beam, Paste the thickness 2.8 centimeter structural plywood of, To function the floor as the structural framework in that put a thickness 1.2 cm of floor finishing material, It has achieved a high strength.

Construction ・ Construction method ・ specification. Three times the floor structural strength when compared from the previous adopted the joists less four laps nailing method. Plywood for the structure of direct thickness 2.8 centimeter to foundation, 1.2 realize that the high strength put the finishing material of centimeter. Even to twist phenomenon that occurs at the time of earthquake, It enhances safety
Three times the floor structural strength when compared from the previous adopted the joists less four laps nailing method. Plywood for the structure of direct thickness 2.8 centimeter to foundation, 1.2 realize that the high strength put the finishing material of centimeter. Even to twist phenomenon that occurs at the time of earthquake, It enhances safety



Location