Investing in Japanese real estate
New Homes » Kanto » Saitama » Ageo
Local appearance photoIt was off scaffolding. It is completed soon. Floor plan35,800,000 yen, 4LDK, Land area 134.95 sq m , It was out of the building area 103.5 sq m scaffolding. You can also preview therefore do not hesitate please contact us Compartment figure35,800,000 yen, 4LDK, Land area 134.95 sq m , Building area 103.5 sq m Local appearance photo Construction ・ Construction method ・ specificationStandard adopted "rebar-filled concrete mat foundation" to the foundation in this property. The base portion is Haisuji the 13mm rebar in a grid pattern in 200mm pitch, It made by pouring concrete. Because solid foundation to cover the basis of the whole ground, It can be transmitted to the ground by dispersing a load of the building, It is possible to improve the durability and earthquake resistance against immobility subsidence. or, Because under the floor over the entire surface is concrete will also be moisture-proof measures. Other EquipmentTo take full advantage of the dead space of the feet, The pursuit of storage capacity and ease of use "slide type" Primary schoolOishikita 600m up to elementary school Construction ・ Construction method ・ specificationIn this listing is, Using a ceramic system of siding on the outer wall finish, Has adopted the "outer wall ventilation method" in which a ventilation space between the wall and the outer wall coverings. This, The moisture of the wall inside the body can be efficiently released into the outside air, To suppress the internal condensation, You can improve the durability. In the summer, The ventilation of the air layer, You can also expect the thermal barrier effect. Other Equipment ・ The height of the wash basin is 800mm. Washing the face can also be shampoo also in a comfortable position. ・ It is a bowl shape in pursuit of ease of use. ・ Freshly every type of toothbrush comes with. ・ It can be a wide range of storage from some of the height that you want to stock up small. Junior high school600m to Oishi junior high school Construction ・ Construction method ・ specificationTo prevent the deterioration of the building, It is important the elimination of under the floor of the moisture that causes corrosion of the structural part. In our property adopted in the standard "basic packing method", Of conventional construction method 1.5 ~ Exert twice the underfloor ventilation performance. To protect the foundation of the house from moisture, It works to improve the durability. Other Equipment ・ Firm water-saving in the new shape that eliminates the waste. ・ In devising friendly body, Comfortable entering and relaxation. ・ Water-saving effect About 14% StationTakasaki Line 1200m to "Kitaageo" Construction ・ Construction method ・ specificationAdopt a "seismic hardware" is at the junction anchoring the structure material. Foundation ・ Foundation ・ Select the right man in the right place seismic hardware for each joint, such as pillars, Firmly Tightened the structure. Prevent the building of distortion and collapse from the shaking caused by an earthquake, It has extended the durability of the whole house. Other Equipment ・ Borderless shape in consideration of the cleaning ease ・ Tornado cleaning to wash all over the inside of the toilet bowl in the double of water flow ・ The pottery surface was coated in slippery at the nano-level "Sefi on Detect" toilet bowl ・ Automatically from "deodorizing", Deodorizing in cooperation switches to suction weight of about 2 times the "power deodorizing" Construction ・ Construction method ・ specificationResidential insulation performance will depend largely on the performance of the opening. Other EquipmentSince the button to use the operation is divided into the four corners of the equipment, Press mistake there is less. LED lights slowly light and night of the visitor presses the call button, Also it made a friendly consideration to the eyes of visitors, You can check the firm visitors in color at night in the internal organs lighting Construction ・ Construction method ・ specificationIn this listing is, First floor and the thickness on the second floor of the floor was to select "Tsuyoshiyuka method" to lay the 24mm of plywood. Other EquipmentClean air 24-hour ventilation system which performs plan to the discharge of the supply air and dirty air. By moisture easily accumulate room also forced ventilation at all times, It is also effective in the suppression of condensation and mold. Location |