New Homes » Kanto » Saitama » Fujimino


Saitama Prefecture Fujimino
Tobu Tojo Line "Kamifukuoka" walk 19 minutes
Pre-ground survey, Parking two Allowed, Fiscal year Available, Super close, It is close to the city, System kitchen, Bathroom Dryer, Yang per good, All room storage, Flat to the station, A quiet residential area, Around traffic fewer, sum
Pre-ground survey, Parking two Allowed, Fiscal year Available, Super close, It is close to the city, System kitchen, Bathroom Dryer, Yang per good, All room storage, Flat to the station, A quiet residential area, Around traffic fewerese-style room, Washbasin with shower, Face-to-face kitchen, Barrier-free, Toilet 2 places, Bathroom 1 tsubo or more, 2-story, South balcony, Warm water washing toilet seat, Underfloor Storage, The window in the bathroom, TV monitor interphone, Ventilation good, Water filter, City gas, All rooms are two-sided lighting, Flat terrain
Features pickup
Pre-ground survey / Parking two Allowed / Fiscal year Available / Super close / It is close to the city / System kitchen / Bathroom Dryer / Yang per good / All room storage / Flat to the station / A quiet residential area / Around traffic fewer / Japanese-style room / Washbasin with shower / Face-to-face kitchen / Barrier-free / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / South balcony / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / TV monitor interphone / Ventilation good / Water filter / City gas / All rooms are two-sided lighting / Flat terrain
Event information
Local guide Board (please make a reservation beforehand) schedule / Every Saturday and Sunday time / 10:00 ~ 17:00
Price
31,800,000 yen
Floor plan
4LDK
Units sold
1 units
Total units
2 units
Land area
119.3 sq m (measured)
Building area
97.7 sq m (measured)
Driveway burden-road
Nothing, North 4m width
Completion date
January 2014
Address
Saitama Prefecture Fujimino Matsuyama 1
Traffic
Tobu Tojo Line "Kamifukuoka" walk 19 minutes
Related links
[Related Sites of this company]
Person in charge
Rep Oka Kaori Age: 30 Daigyokai experience: a children's room in one year store, Relax please you can consult. Because long live house, Also important to create an environment that carefully can study. Surrounding environment and school, etc., Please feel free to contact us because there is less information to understand on the net.
Contact
TEL: 0800-603-7395 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
60% ・ 200%
Time residents
Three months after the contract
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One middle and high
Other limitations
Regulations have by the Landscape Act, Shade limit Yes
Overview and notices
Contact: Oka Kaori, Facilities: Public Water Supply, This sewage, City gas, Building confirmation number: No. SJX-KX1317032234, Parking: car space
Company profile
<Mediation> Saitama Governor (2) the first 020,984 No. Century 21 (stock) life buddy Yubinbango356-0050 Saitama Prefecture Fujimino Fujimino 4-13-13


Floor plan

Floor plan. 31,800,000 yen, 4LDK, Land area 119.3 sq m , Building area 97.7 sq m
31,800,000 yen, 4LDK, Land area 119.3 sq m , Building area 97.7 sq m

Rendering (appearance)

Rendering (appearance). ( 1 Building) Rendering
( 1 Building) Rendering

Local appearance photo

Local appearance photo. Local (12 May 2013) Shooting
Local (12 May 2013) Shooting

Local appearance photo. Local (12 May 2013) Shooting
Local (12 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Standard adopted "rebar-filled concrete mat foundation" to the foundation in this property.  The base portion is Haisuji the 13mm rebar in a grid pattern in 200mm pitch, It made by pouring concrete.  Because solid foundation to cover the basis of the whole ground, It can be transmitted to the ground by dispersing a load of the building,  It is possible to improve the durability and earthquake resistance against immobility subsidence. or, Because under the floor over the entire surface is concrete will also be moisture-proof measures.
Standard adopted "rebar-filled concrete mat foundation" to the foundation in this property. The base portion is Haisuji the 13mm rebar in a grid pattern in 200mm pitch, It made by pouring concrete. Because solid foundation to cover the basis of the whole ground, It can be transmitted to the ground by dispersing a load of the building, It is possible to improve the durability and earthquake resistance against immobility subsidence. or, Because under the floor over the entire surface is concrete will also be moisture-proof measures.

Other Equipment

Other Equipment. To take full advantage of the dead space of the feet, The pursuit of storage capacity and ease of use "slide type"
To take full advantage of the dead space of the feet, The pursuit of storage capacity and ease of use "slide type"

Local photos, including front road

Local photos, including front road. Local (12 May 2013) Shooting
Local (12 May 2013) Shooting

Compartment figure

Compartment figure. 31,800,000 yen, 4LDK, Land area 119.3 sq m , Building area 97.7 sq m sectioning
31,800,000 yen, 4LDK, Land area 119.3 sq m , Building area 97.7 sq m sectioning

Local appearance photo

Local appearance photo. Local (12 May 2013) Shooting
Local (12 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. In this listing is, Using a ceramic system of siding on the outer wall finish,
In this listing is, Using a ceramic system of siding on the outer wall finish,

Other Equipment

Other Equipment. Water purifier visceral hand shower. Hard to the entire surface of embossing sink scratches and dirt.
Water purifier visceral hand shower. Hard to the entire surface of embossing sink scratches and dirt.

Local appearance photo

Local appearance photo. Local (12 May 2013) Shooting
Local (12 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. To prevent the deterioration of the building, It is important the elimination of under the floor of the moisture that causes corrosion of the structural part.
To prevent the deterioration of the building, It is important the elimination of under the floor of the moisture that causes corrosion of the structural part.

Other Equipment

Other Equipment. Up-and-down grill door with anhydrous one side grill
Up-and-down grill door with anhydrous one side grill

Local appearance photo

Local appearance photo. Local (12 May 2013) Shooting
Local (12 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Adopt a "seismic hardware" is at the junction anchoring the structure material.
Adopt a "seismic hardware" is at the junction anchoring the structure material.

Other Equipment

Other Equipment. The height of the wash basin is 800mm. Washing the face can also be shampoo also in a comfortable position.
The height of the wash basin is 800mm. Washing the face can also be shampoo also in a comfortable position.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Residential insulation performance will depend largely on the performance of the opening.
Residential insulation performance will depend largely on the performance of the opening.

Other Equipment

Other Equipment. Firm water-saving in the new shape that eliminates the waste.
Firm water-saving in the new shape that eliminates the waste.

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. In this listing is, First floor and the thickness on the second floor of the floor was to select "Tsuyoshiyuka method" to lay the 24mm of plywood.
In this listing is, First floor and the thickness on the second floor of the floor was to select "Tsuyoshiyuka method" to lay the 24mm of plywood.

Other Equipment

Other Equipment.  ・ Use the urethane foam of about 50mm in the heat insulating layer, Insulation floor was from the sole of the foot difficult to deprive the heat
・ Use the urethane foam of about 50mm in the heat insulating layer, Insulation floor was from the sole of the foot difficult to deprive the heat



Location