New Homes » Kanto » Saitama » Gyoda


Saitama Prefecture Gyoda
Chichibu "Higashigyoda" walk 1 minute
Chichibu "Higashigyoda" 1-minute walk to the station, Sakuragaoka walk to elementary school 9 minutes! Station and supermarket within walking distance, In a good location that schools are aligned, Energy saving house of top runner standards birth
■ Ensure the 2 cars each building parking. Enjoy the full car life ■ Top Runner Program corresponding housing that was standard equipment energy-saving water heater eco Jaws ■ Efficient housework flow line that was to concentrate the wealth of storage space and water around
Features pickup
Measures to conserve energy / Parking two Allowed / Immediate Available / Land 50 square meters or more / Energy-saving water heaters / Super close / It is close to the city / Facing south / Yang per good / All room storage / LDK15 tatami mats or more / Japanese-style room / garden / Washbasin with shower / Face-to-face kitchen / Barrier-free / Toilet 2 places / Bathroom 1 tsubo or more / 2-story / South balcony / Warm water washing toilet seat / Nantei / Underfloor Storage / The window in the bathroom / High-function toilet / Ventilation good / Walk-in closet / All room 6 tatami mats or more / Water filter
Property name
Five Is Home Gyoda Sakuramachi 2-chome
Price
22,800,000 yen
Floor plan
4LDK
Units sold
1 units
Total units
4 units
Land area
177.59 sq m (53.72 square meters)
Building area
109.3 sq m (33.06 square meters)
Driveway burden-road
Road width: 4.01m ~ 4.6m
Completion date
May 2013
Address
Saitama Prefecture Gyoda Sakuramachi 2
Traffic
Chichibu "Higashigyoda" walk 1 minute
Related links
[Related Sites of this company]
Contact
TEL: 0800-603-1294 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Building coverage, floor area ratio
Kenpei rate: 80%, Volume ratio: 200%
Time residents
Immediate available
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Construction
Ltd. Five Is Home
Use district
Residential
Land category
Residential land
Overview and notices
Building confirmation number: No. SJK-KX-1211042703 other, Tokyo Electric Power Co., Public Water Supply, This sewage, City gas
Company profile
<Seller> Saitama Governor (10) No. 008395 (Corporation) Prefecture Building Lots and Buildings Transaction Business Association (Corporation) metropolitan area real estate Fair Trade Council member (Ltd.) Five Izu Home Yubinbango361-0056 Saitama Prefecture Gyoda Mochida 3-2-17


Other

Other. With a commitment to house offers
With a commitment to house offers

Local appearance photo

Local appearance photo. A Building site (July 2013) Shooting
A Building site (July 2013) Shooting

Floor plan

Floor plan. (A Building), Price 22,800,000 yen, 4LDK, Land area 177.59 sq m , Building area 109.3 sq m
(A Building), Price 22,800,000 yen, 4LDK, Land area 177.59 sq m , Building area 109.3 sq m

Primary school

Primary school. Sakuragaoka to elementary school 680m  Elementary school in a 9-minute walk. Distance of safely in small children
Sakuragaoka to elementary school 680m Elementary school in a 9-minute walk. Distance of safely in small children

Junior high school

Junior high school. 540m to Nagano Junior High School  It is likely to be go home happy to be made late in extracurricular activities if the distance of 7 minutes walk
540m to Nagano Junior High School It is likely to be go home happy to be made late in extracurricular activities if the distance of 7 minutes walk

Other Equipment

Other Equipment. 3-burner stove with a variety of functions. Cleaning a glass top is also happy to. Peace of mind sensor (cooking oil overheating prevention device) is also standard equipment (same specifications)
3-burner stove with a variety of functions. Cleaning a glass top is also happy to. Peace of mind sensor (cooking oil overheating prevention device) is also standard equipment (same specifications)

Other Equipment. Plenty of storage frequently used tools. From Maeru near where the use, The amount that move around in the dishes you have less (the same specification)
Plenty of storage frequently used tools. From Maeru near where the use, The amount that move around in the dishes you have less (the same specification)

Other Equipment. Close also slowly safely opened. A little function, Us with fun and comfortable daily housework (same specifications)
Close also slowly safely opened. A little function, Us with fun and comfortable daily housework (same specifications)

Other Equipment. Conventional than the increase in capacity, Those wet adopted the wet area to put (same specifications)
Conventional than the increase in capacity, Those wet adopted the wet area to put (same specifications)

Other Equipment. Only the counter there is no seams and gaps wipe the Sasa' also dirty (photo left). Hair catcher Torinozokeru and Sasa' the trash, such as hair (center). There is no gap between the cleaning was difficult was borderless drainage groove (on the right in the photo)
Only the counter there is no seams and gaps wipe the Sasa' also dirty (photo left). Hair catcher Torinozokeru and Sasa' the trash, such as hair (center). There is no gap between the cleaning was difficult was borderless drainage groove (on the right in the photo)

Other Equipment. Fluorescent lamp Certified middle panel having a function as a three-sided mirror and storage door. Center mirror part has to "cloudy shut" (same specifications)
Fluorescent lamp Certified middle panel having a function as a three-sided mirror and storage door. Center mirror part has to "cloudy shut" (same specifications)

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Combination of the wall panel construction to framing construction method (conventional method), Monocoque construction method integrated as a box. Also distributed in a well-balanced receiving the pressure in the plane when subjected to strong external force by earthquakes and typhoons
Combination of the wall panel construction to framing construction method (conventional method), Monocoque construction method integrated as a box. Also distributed in a well-balanced receiving the pressure in the plane when subjected to strong external force by earthquakes and typhoons

Construction ・ Construction method ・ specification. Under the floor is shut out the moisture in the solid foundation. The base uses the anti-termite treated dry wood, Furthermore antiseptic on the structure material within 1m from the ground surface ・ Do the anti-termite treatment
Under the floor is shut out the moisture in the solid foundation. The base uses the anti-termite treated dry wood, Furthermore antiseptic on the structure material within 1m from the ground surface ・ Do the anti-termite treatment

Construction ・ Construction method ・ specification. Provided with a layer of waterproof breathable sheet to the entire outer wall, In addition we made a vent layer on the outside. By any chance, Even moisture penetrates into the wall, Promptly discharged in the circulation of air. This, Effectively prevent internal condensation, External wall material, It enhances the durability of structural materials
Provided with a layer of waterproof breathable sheet to the entire outer wall, In addition we made a vent layer on the outside. By any chance, Even moisture penetrates into the wall, Promptly discharged in the circulation of air. This, Effectively prevent internal condensation, External wall material, It enhances the durability of structural materials

Construction ・ Construction method ・ specification. Floor, The structural plywood with a thickness of 28mm to the floor beams were brought into close contact with nails and glue "Tsuyoshiyuka structure". Receiving a force from the side, such as earthquakes and typhoons, It can be dispersed in a well-balanced load-bearing wall
Floor, The structural plywood with a thickness of 28mm to the floor beams were brought into close contact with nails and glue "Tsuyoshiyuka structure". Receiving a force from the side, such as earthquakes and typhoons, It can be dispersed in a well-balanced load-bearing wall

Construction ・ Construction method ・ specification. On the wall panel which serves to receive the pressure in the plane, Strength and durability, Use the plywood for the excellent structure also in lightweight. further, Integrated between 構架 material, Is the ideal wall was strengthened
On the wall panel which serves to receive the pressure in the plane, Strength and durability, Use the plywood for the excellent structure also in lightweight. further, Integrated between 構架 material, Is the ideal wall was strengthened

Construction ・ Construction method ・ specification. Employing a reliable joint metal for joining of the main portion of the shaft assembly. And Tightened the junction with a dedicated structure for the hardware of, We make a strong house as shelter
Employing a reliable joint metal for joining of the main portion of the shaft assembly. And Tightened the junction with a dedicated structure for the hardware of, We make a strong house as shelter

Same specifications photo (bathroom)

Same specifications photo (bathroom). (A Building) same specification system bus
(A Building) same specification system bus

Same specifications photos (Other introspection)

Same specifications photos (Other introspection). (A Building) same specification Western and walk-in closet
(A Building) same specification Western and walk-in closet

Same specifications photos (Other introspection). (A Building) corridor leading to the same specifications balcony
(A Building) corridor leading to the same specifications balcony



Location