New Homes » Kanto » Saitama » Hanyu


Saitama Prefecture Hanyu
Isesaki Tobu "Hanyu" walk 20 minutes
400,000 yen worth option gift Campaign! ! ! For more details, until the free toll-free 0800-602-6637
Pre-ground survey, Land 50 square meters or more, LDK15 tatami mats or more, Face-to-face kitchen, Parking two Allowed, Corresponding to the flat-35S, It is close to the city, System kitchen, Bathroom Dryer, All room storage, A quiet residential areaese-style room, Washbasin with shower, Barrier-free, Toilet 2 places, Bathroom 1 tsubo or more, 2-story, Double-glazing, Warm water washing toilet seat, Underfloor Storage, The window in the bathroom, TV monitor interphone, Walk-in closet, Water filter, Storeroom
Price
16.8 million yen ~ 19,800,000 yen
Floor plan
4LDK ~ 4LDK + S (storeroom)
Units sold
4 units
Total units
4 units
Land area
185.73 sq m ~ 195.72 sq m (registration)
Building area
99.63 sq m ~ 102.87 sq m (registration)
Driveway burden-road
Road width: 4m, Asphaltic pavement
Completion date
2013 late December plans
Address
Saitama Prefecture Hanyu City East 3-53 No. 8
Traffic
Isesaki Tobu "Hanyu" walk 20 minutes
Contact
TEL: 0800-602-6637 [Toll free] mobile phone ・ Also available from PHS
Caller ID is not notified
Please contact the "saw SUUMO (Sumo)"
If it does not lead, If the real estate company
Event information
Local guide Board (Please be sure to ask in advance) schedule / Every Saturday, Sunday and public holidays time / 10:00 ~ 17:00
Most price range
16 million yen ・ 18 million yen ・ 19 million yen 1600 (each 2 units)
Building coverage, floor area ratio
Kenpei rate: 50%, Volume ratio: 80%
Time residents
2 months after the contract
Land of the right form
Ownership
Structure and method of construction
Wooden 2-story (framing method)
Use district
One low-rise
Land category
Residential land
Overview and notices
Building confirmation number: No. 13UDI1W Ken 02164
Company profile
<Mediation> Ibaraki Governor (2) No. 006394 (Ltd.) Ecos Home Yubinbango306-0235 Ibaraki Prefecture Koga Shimoheimi 2198-1


Same specifications photos (appearance)

Same specifications photos (appearance). ( Building) same specification
( Building) same specification

Same specifications photo (kitchen)

Same specifications photo (kitchen). ( Building) same specification
( Building) same specification

Same specifications photos (living)

Same specifications photos (living). ( Building) same specification
( Building) same specification

Same specifications photos (appearance)

Same specifications photos (appearance). ( Building) same specification
( Building) same specification

Same specifications photo (bathroom)

Same specifications photo (bathroom). ( Building) same specification
( Building) same specification

Same specifications photo (kitchen)

Same specifications photo (kitchen). ( Building) same specification
( Building) same specification

Wash basin, toilet

Wash basin, toilet. Same specifications basin
Same specifications basin

Other introspection

Other introspection. Same specifications Japanese-style room
Same specifications Japanese-style room

Other

Other. Ground survey
Ground survey

Same specifications photos (appearance)

Same specifications photos (appearance). ( Building) same specification
( Building) same specification

Other introspection

Other introspection. TV camera intercom
TV camera intercom

Other

Other. Earthquake-resistant bracket structure
Earthquake-resistant bracket structure

Other introspection

Other introspection. Receipt
Receipt

Other

Other. Substructure
Substructure

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Shaking the (seismic intensity 7 equivalent) was added to the pressure, To verify the degree of damage of the building, We confirmed that the seismic performance is present in sufficient. Please live with confidence.
Shaking the (seismic intensity 7 equivalent) was added to the pressure, To verify the degree of damage of the building, We confirmed that the seismic performance is present in sufficient. Please live with confidence.

Construction ・ Construction method ・ specification. Using a large three-dimensional vibration table test facility at the Public Works Research Institute, We made a seismic experiment of standard architecture specification housing.
Using a large three-dimensional vibration table test facility at the Public Works Research Institute, We made a seismic experiment of standard architecture specification housing.

Present

Present. 400,000 yen worth option gift Campaign! ! !
400,000 yen worth option gift Campaign! ! !



Location