New Homes » Kanto » Tokyo » Edogawa


Edogawa-ku, Tokyo
JR Sobu Line "Shinkoiwa" walk 22 minutes
Was completion of framework.
Features pickup
LDK15 tatami mats or more / Japanese-style room / Washbasin with shower / Toilet 2 places / Warm water washing toilet seat / Underfloor Storage / The window in the bathroom / TV monitor interphone / Three-story or more / Flat terrain
Event information
Local sales meetings (please visitors to direct local) schedule / Every Saturday, Sunday and public holidays time / 10:00 ~ 17:00
Property name
Libre Garden Matsumoto 4 buildings
Price
37,800,000 yen ~ 39,800,000 yen
Floor plan
3LDK + S (storeroom) ~ 4LDK
Units sold
4 units
Total units
4 units
Land area
70.26 sq m ~ 84.78 sq m (registration)
Building area
93.14 sq m ~ 102.06 sq m
Driveway burden-road
Road width: 5.45m, Asphaltic pavement
Completion date
2013 early December
Address
Edogawa-ku, Tokyo Matsumoto 1-4-8
Traffic
JR Sobu Line "Shinkoiwa" walk 22 minutes Keisei bus "Sugawara Bridge" walk 2 minutes
Contact
(Ltd.) SS housing TEL: 03-5879-3835 "saw SUUMO (Sumo)" and please contact
Building coverage, floor area ratio
Kenpei rate: 60%, Volume ratio: 200% ・ 300%
Time residents
Consultation
Land of the right form
Ownership
Structure and method of construction
Wooden three-story
Construction
One construction Co., Ltd.
Use district
Residential
Land category
Residential land
Overview and notices
Building confirmation number: KS113-3120-00210 ~ KS113-3120-00213
Company profile
<Marketing alliance (agency)> Governor of Tokyo (1) No. 095278 (Ltd.) SS housing Yubinbango132-0033 Edogawa-ku, Tokyo Higashikomatsugawa 4-54-16 Pearl Hills 102


Other local

Other local. layout drawing
layout drawing

Other

Other. Taken between 1 Building
Taken between 1 Building

Other. Taken between Building 2
Taken between Building 2

Local appearance photo

Local appearance photo. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Standard adopted "rebar-filled concrete mat foundation" to the foundation in this property.  The base portion is Haisuji the 13mm rebar in a grid pattern in 200mm pitch, It made by pouring concrete.  Because solid foundation to cover the basis of the whole ground, It can be transmitted to the ground by dispersing a load of the building,  It is possible to improve the durability and earthquake resistance against immobility subsidence. or, Because under the floor over the entire surface is concrete will also be moisture-proof measures.
Standard adopted "rebar-filled concrete mat foundation" to the foundation in this property. The base portion is Haisuji the 13mm rebar in a grid pattern in 200mm pitch, It made by pouring concrete. Because solid foundation to cover the basis of the whole ground, It can be transmitted to the ground by dispersing a load of the building, It is possible to improve the durability and earthquake resistance against immobility subsidence. or, Because under the floor over the entire surface is concrete will also be moisture-proof measures.

Other Equipment

Other Equipment.  ・ Smart counter of the apron and back guard shape ・ Handle of aluminum line and refreshing ・ In flat until the feet, Silver stocker of design that was clean
・ Smart counter of the apron and back guard shape ・ Handle of aluminum line and refreshing ・ In flat until the feet, Silver stocker of design that was clean

Other

Other. Taken between Building 3
Taken between Building 3

Local appearance photo

Local appearance photo. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. Adopt a "seismic hardware" is at the junction anchoring the structure material. Foundation ・ Foundation ・ Select the right man in the right place seismic hardware for each joint, such as pillars, Firmly Tightened the structure. Prevent the building of distortion and collapse from the shaking caused by an earthquake, It has extended the durability of the whole house.
Adopt a "seismic hardware" is at the junction anchoring the structure material. Foundation ・ Foundation ・ Select the right man in the right place seismic hardware for each joint, such as pillars, Firmly Tightened the structure. Prevent the building of distortion and collapse from the shaking caused by an earthquake, It has extended the durability of the whole house.

Other Equipment

Other Equipment. In everyday life, Take Ya climbing stairs, Standing Sitting of toilet, Burden on the legs is a big operation. Also to the safety of others are on the handrail, There is a big role in reducing the burden on the body.
In everyday life, Take Ya climbing stairs, Standing Sitting of toilet, Burden on the legs is a big operation. Also to the safety of others are on the handrail, There is a big role in reducing the burden on the body.

Other

Other. Taken between 4 Building
Taken between 4 Building

Local appearance photo

Local appearance photo. Local (10 May 2013) Shooting
Local (10 May 2013) Shooting

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. In this listing is, Using a ceramic system of siding on the outer wall finish, Has adopted the "outer wall ventilation method" in which a ventilation space between the wall and the outer wall coverings. This, The moisture of the wall inside the body can be efficiently released into the outside air, To suppress the internal condensation, You can improve the durability. In the summer, The ventilation of the air layer, You can also expect the thermal barrier effect.
In this listing is, Using a ceramic system of siding on the outer wall finish, Has adopted the "outer wall ventilation method" in which a ventilation space between the wall and the outer wall coverings. This, The moisture of the wall inside the body can be efficiently released into the outside air, To suppress the internal condensation, You can improve the durability. In the summer, The ventilation of the air layer, You can also expect the thermal barrier effect.

Other Equipment

Other Equipment.  ・ Borderless shape in consideration of the cleaning ease ・ Tornado cleaning to wash all over the inside of the toilet bowl in the double of water flow ・ The pottery surface was coated in slippery at the nano-level "Sefi on Detect" toilet bowl ・ Automatically from "deodorizing", Deodorizing in cooperation switches to suction weight of about 2 times the "power deodorizing"
・ Borderless shape in consideration of the cleaning ease ・ Tornado cleaning to wash all over the inside of the toilet bowl in the double of water flow ・ The pottery surface was coated in slippery at the nano-level "Sefi on Detect" toilet bowl ・ Automatically from "deodorizing", Deodorizing in cooperation switches to suction weight of about 2 times the "power deodorizing"

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. In this listing is, First floor and the thickness on the second floor of the floor was to select "Tsuyoshiyuka method" to lay the 24mm of plywood.
In this listing is, First floor and the thickness on the second floor of the floor was to select "Tsuyoshiyuka method" to lay the 24mm of plywood.

Other Equipment

Other Equipment.  ・ Es line tub of spacious shape → sitz bath and parent and child bathing also relaxed. Easy to sit on the edge, Ease out ・ Easy to dry, Adopt a non-slip Flagstone floor. Cleaning is also easy to ・ Is a tub of hard insulation specifications escape the heat. Number of times reheating also to reduce and you can save energy costs
・ Es line tub of spacious shape → sitz bath and parent and child bathing also relaxed. Easy to sit on the edge, Ease out ・ Easy to dry, Adopt a non-slip Flagstone floor. Cleaning is also easy to ・ Is a tub of hard insulation specifications escape the heat. Number of times reheating also to reduce and you can save energy costs

Construction ・ Construction method ・ specification

Construction ・ Construction method ・ specification. To prevent the deterioration of the building, It is important the elimination of under the floor of the moisture that causes corrosion of the structural part.
To prevent the deterioration of the building, It is important the elimination of under the floor of the moisture that causes corrosion of the structural part.

Other Equipment

Other Equipment. Residential insulation performance will depend largely on the performance of the opening. Door that has been adopted in this property is the thermal insulation specifications to frame. Also, The window glass, Greatly solar heat and ultraviolet light to adopt a thermal barrier Low-e double glass that can be cut, To achieve a reduction of good indoor environment and the heating and cooling load
Residential insulation performance will depend largely on the performance of the opening. Door that has been adopted in this property is the thermal insulation specifications to frame. Also, The window glass, Greatly solar heat and ultraviolet light to adopt a thermal barrier Low-e double glass that can be cut, To achieve a reduction of good indoor environment and the heating and cooling load

Other Equipment. Enhance the thermal efficiency by effectively utilizing the waste heat that occurs when a boil water, If "energy-saving water heater" Eco Jaws, Herase the amount of gas, Since CO2 emissions also become less of, It can contribute to the prevention of global warming, In addition you can also save gas rates.
Enhance the thermal efficiency by effectively utilizing the waste heat that occurs when a boil water, If "energy-saving water heater" Eco Jaws, Herase the amount of gas, Since CO2 emissions also become less of, It can contribute to the prevention of global warming, In addition you can also save gas rates.



Location